[{"data":1,"prerenderedAt":1689},["ShallowReactive",2],{"layout-menus-en-ie":3,"sidebar-about-us-en-ie":930,"breadcrumb-titles-\u002Fen-ie\u002Fabout-us\u002Fiarnrod-eireann-projects-and-investments\u002Fnavan-railway-line\u002Fnspc2-en-ie":1321,"content-about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fnavan-railway-line\u002Fnspc2-en-ie":1322},{"topbarMenu":4,"megaMenu":22,"footerMenu":727,"mainFooterMenu":757,"usefulLinks":905},[5,15],{"__typename":6,"_system_":7,"label":9,"linkedItem":10,"externalUrl":11,"newWindow":12,"queryParameter":14},"Link",{"id":8},"187feb0d-011d-5298-83a0-076ecb893cac","My Booking",null,"https:\u002F\u002Fbooking.cf.irishrail.ie\u002Fen-IE\u002Fbooking\u002Flogin",{"items":13},[],"",{"__typename":6,"_system_":16,"label":18,"linkedItem":10,"externalUrl":19,"newWindow":20,"queryParameter":14},{"id":17},"7b1f1c1c-31d1-52c5-98cd-d8223867fcab","Login","https:\u002F\u002Fbooking.cf.irishrail.ie\u002Fen-IE\u002Fmys3\u002Flogin",{"items":21},[],[23,153,352,529,608],{"__typename":24,"_system_":25,"label":27,"slug":28,"queryParameter":14,"subpages":29},"Navigation",{"id":26},"a9de7eda-4619-5a21-9b23-df8ac02e8e65","Timetables and Routes","timetables-routes",{"items":30},[31,59,86],{"__typename":24,"_system_":32,"label":34,"slug":35,"queryParameter":14,"link":10,"subpages":36},{"id":33},"dfd9a447-e01b-5dbb-8648-dc683f6f2762","Live Trains","live-trains",{"items":37},[38,49],{"__typename":6,"_system_":39,"label":41,"linkedItem":42,"externalUrl":14,"newWindow":45,"style":47,"queryParameter":14},{"id":40},"0836421c-42bb-5c08-8c1b-f2e854303e35","Live Departures",{"__typename":43,"slug":44},"Page","train-timetables\u002Flive-departure-train-times",{"items":46},[],{"items":48},[],{"__typename":6,"_system_":50,"label":52,"linkedItem":53,"externalUrl":14,"newWindow":54,"style":56,"queryParameter":58},{"id":51},"da80a65e-3cc8-5ebd-92c3-ca97dbe96c61","Live Arrivals",{"__typename":43,"slug":44},{"items":55},[],{"items":57},[],"?tab=arrivals",{"__typename":24,"_system_":60,"label":62,"slug":63,"queryParameter":14,"link":10,"subpages":64},{"id":61},"c71dc801-ee0c-5e36-8870-a61a7488b535","Timetables","timetables",{"items":65},[66,76],{"__typename":6,"_system_":67,"label":69,"linkedItem":70,"externalUrl":14,"newWindow":72,"style":74,"queryParameter":14},{"id":68},"8004fa58-05a2-525d-8cf4-e0e90dd7ddae","PDF Timetables by Route",{"__typename":43,"slug":71},"train-timetables\u002Ftimetables-by-route",{"items":73},[],{"items":75},[],{"__typename":6,"_system_":77,"label":79,"linkedItem":80,"externalUrl":14,"newWindow":82,"style":84,"queryParameter":14},{"id":78},"d8b7c19e-f49f-5e82-b8f4-fe5f0daf5394","PDF Timetables by Station",{"__typename":43,"slug":81},"train-timetables\u002Ftimetables-by-station",{"items":83},[],{"items":85},[],{"__typename":24,"_system_":87,"label":89,"slug":90,"queryParameter":14,"link":10,"subpages":91},{"id":88},"71e59b0e-033c-5d9b-8b83-6985b46961eb","Routes","routes",{"items":92},[93,103,113,123,133,143],{"__typename":6,"_system_":94,"label":96,"linkedItem":97,"externalUrl":14,"newWindow":99,"style":101,"queryParameter":14},{"id":95},"ac0c9958-6966-5057-9fc7-5cc3e0ed6cc2","Ireland Rail Map",{"__typename":43,"slug":98},"travel-information\u002Fstation-and-route-maps\u002Fireland-rail-map",{"items":100},[],{"items":102},[],{"__typename":6,"_system_":104,"label":106,"linkedItem":107,"externalUrl":14,"newWindow":109,"style":111,"queryParameter":14},{"id":105},"194d753f-5c6b-51af-b423-d292c1724b45","Ireland Live Map",{"__typename":43,"slug":108},"train-timetables\u002Fintercity-live-map",{"items":110},[],{"items":112},[],{"__typename":6,"_system_":114,"label":116,"linkedItem":117,"externalUrl":14,"newWindow":119,"style":121,"queryParameter":14},{"id":115},"91186157-b41c-57e9-bce9-70b292941e5f","Dublin Rail Map",{"__typename":43,"slug":118},"travel-information\u002Fstation-and-route-maps\u002Fdublin-symbolic-map",{"items":120},[],{"items":122},[],{"__typename":6,"_system_":124,"label":126,"linkedItem":127,"externalUrl":14,"newWindow":129,"style":131,"queryParameter":14},{"id":125},"6a767260-5bd1-5734-ac0f-0c4e75de7489","DART Live Map",{"__typename":43,"slug":128},"train-timetables\u002Fdart-live-map",{"items":130},[],{"items":132},[],{"__typename":6,"_system_":134,"label":136,"linkedItem":137,"externalUrl":14,"newWindow":139,"style":141,"queryParameter":14},{"id":135},"6e373a3c-20c9-5eb0-b207-0c0aa992b090","Commuter Live Map",{"__typename":43,"slug":138},"train-timetables\u002Fcommuter-live-map",{"items":140},[],{"items":142},[],{"__typename":6,"_system_":144,"label":146,"linkedItem":147,"externalUrl":14,"newWindow":149,"style":151,"queryParameter":14},{"id":145},"dd16f320-6663-5678-85da-87c9c2fd5a61","Cork Rail Map",{"__typename":43,"slug":148},"travel-information\u002Fstation-and-route-maps\u002Fcork-symbolic-map",{"items":150},[],{"items":152},[],{"__typename":24,"_system_":154,"label":156,"slug":157,"queryParameter":14,"subpages":158},{"id":155},"7125bc1d-432f-5d96-95fe-e6edaed5deed","Tickets and Fares","tickets-fares",{"items":159},[160,236,295],{"__typename":24,"_system_":161,"label":163,"slug":164,"queryParameter":14,"link":10,"subpages":165},{"id":162},"22aac54f-e5fe-5820-8f02-8c6d80d7c4df","Buying Tickets","buying-tickets",{"items":166},[167,177,187,197,207,217,227],{"__typename":6,"_system_":168,"label":170,"linkedItem":171,"externalUrl":14,"newWindow":173,"style":175,"queryParameter":14},{"id":169},"968889a1-19a0-5bba-8df4-7c0487b136f0","How to buy tickets online",{"__typename":43,"slug":172},"rail-fares-and-tickets\u002Fhow-to-guide\u002Fguide-to-buying-online",{"items":174},[],{"items":176},[],{"__typename":6,"_system_":178,"label":180,"linkedItem":181,"externalUrl":14,"newWindow":183,"style":185,"queryParameter":14},{"id":179},"f4c8dfdb-df7b-55f2-9fa6-268273d2daeb","Free travel pass and valid ticket holders",{"__typename":43,"slug":182},"rail-fares-and-tickets\u002Fhow-to-guide\u002Fbooking-a-seat-only-reservation",{"items":184},[],{"items":186},[],{"__typename":6,"_system_":188,"label":190,"linkedItem":191,"externalUrl":14,"newWindow":193,"style":195,"queryParameter":14},{"id":189},"81fbdf64-9cc5-5c4d-bc5d-65be97c2d683","Amending and cancelling tickets",{"__typename":43,"slug":192},"rail-fares-and-tickets\u002Fhow-to-guide\u002Famending-reservations",{"items":194},[],{"items":196},[],{"__typename":6,"_system_":198,"label":200,"linkedItem":201,"externalUrl":14,"newWindow":203,"style":205,"queryParameter":14},{"id":199},"1e3cc1c3-8868-5a9d-a6ef-9f068e52be74","Guide to QR Tickets",{"__typename":43,"slug":202},"rail-fares-and-tickets\u002Fhow-to-guide\u002Fguide-qr-rail-tickets",{"items":204},[],{"items":206},[],{"__typename":6,"_system_":208,"label":210,"linkedItem":211,"externalUrl":14,"newWindow":213,"style":215,"queryParameter":14},{"id":209},"55053133-9d7a-542d-99ad-5e5a0a8d6686","Collecting reserved tickets",{"__typename":43,"slug":212},"rail-fares-and-tickets\u002Fhow-to-guide\u002Fcollecting-booking-reservations",{"items":214},[],{"items":216},[],{"__typename":6,"_system_":218,"label":220,"linkedItem":221,"externalUrl":14,"newWindow":223,"style":225,"queryParameter":14},{"id":219},"4ca26f16-2cfa-5dc2-b86e-962bac16d48d","Online Tickets Terms and Conditions",{"__typename":43,"slug":222},"legal\u002Fterms-of-use-privacy-statement-cookie-policy\u002Fonline-tickets-terms-and-conditions",{"items":224},[],{"items":226},[],{"__typename":6,"_system_":228,"label":230,"linkedItem":10,"externalUrl":231,"newWindow":232,"style":234,"queryParameter":14},{"id":229},"be21eb92-258e-592e-ab0c-9872683775e5","Plan Journey","https:\u002F\u002Fjourneyplanner.irishrail.ie\u002Fwebapp\u002F",{"items":233},[],{"items":235},[],{"__typename":24,"_system_":237,"label":239,"slug":240,"queryParameter":14,"link":10,"subpages":241},{"id":238},"b9920d87-de8a-5a44-90ac-a5028c353fd9","Ticket Types","ticket-types",{"items":242},[243,254,264,274,284],{"__typename":6,"_system_":244,"label":246,"linkedItem":247,"externalUrl":14,"newWindow":249,"style":251,"queryParameter":253},{"id":245},"850f6dd4-be2c-57ee-aefe-7c8e043e3694","Online Tickets",{"__typename":43,"slug":248},"rail-fares-and-tickets\u002Ftickets-explained",{"items":250},[],{"items":252},[],"#online-tickets",{"__typename":6,"_system_":255,"label":257,"linkedItem":258,"externalUrl":14,"newWindow":259,"style":261,"queryParameter":263},{"id":256},"da66d950-dc20-5678-acd6-739a0b1e7553","Season Tickets",{"__typename":43,"slug":248},{"items":260},[],{"items":262},[],"#season-tickets",{"__typename":6,"_system_":265,"label":267,"linkedItem":268,"externalUrl":14,"newWindow":269,"style":271,"queryParameter":273},{"id":266},"b9dc3606-86f5-550d-a298-f28e8a35206e","Tourist Tickets",{"__typename":43,"slug":248},{"items":270},[],{"items":272},[],"#tourist-tickets",{"__typename":6,"_system_":275,"label":277,"linkedItem":278,"externalUrl":14,"newWindow":280,"style":282,"queryParameter":14},{"id":276},"ab138d71-0979-5edc-8d7c-4772f28087c5","Leap Cards",{"__typename":43,"slug":279},"rail-fares-and-tickets\u002Fleap-card",{"items":281},[],{"items":283},[],{"__typename":6,"_system_":285,"label":287,"linkedItem":10,"externalUrl":231,"newWindow":288,"style":290,"queryParameter":14},{"id":286},"6e76f749-29a5-5583-a1db-de6d57a7f996","Buy a ticket",{"items":289},[],{"items":291},[292],{"_system_":293},{"codename":294},"highlight",{"__typename":24,"_system_":296,"label":298,"slug":299,"queryParameter":14,"link":10,"subpages":300},{"id":297},"68f3bd72-72d5-5a1e-a390-82624744292b","Fares","fares",{"items":301},[302,312,322,332,342],{"__typename":6,"_system_":303,"label":305,"linkedItem":306,"externalUrl":14,"newWindow":308,"style":310,"queryParameter":14},{"id":304},"0ed3b3d1-6d93-5d5f-ac46-8c30e3097866","Route Fare Calculators",{"__typename":43,"slug":307},"rail-fares-and-tickets\u002Ffares-info",{"items":309},[],{"items":311},[],{"__typename":6,"_system_":313,"label":315,"linkedItem":316,"externalUrl":14,"newWindow":318,"style":320,"queryParameter":14},{"id":314},"aad9c6c2-cdfe-5597-9e75-becb3d67d201","Family Fares",{"__typename":43,"slug":317},"rail-fares-and-tickets\u002Ffamily-travel-by-rail",{"items":319},[],{"items":321},[],{"__typename":6,"_system_":323,"label":325,"linkedItem":326,"externalUrl":14,"newWindow":328,"style":330,"queryParameter":14},{"id":324},"c808c885-5a3e-5e25-8a31-052e5960c571","Young Adults and Student Fares",{"__typename":43,"slug":327},"rail-fares-and-tickets\u002Fstudents",{"items":329},[],{"items":331},[],{"__typename":6,"_system_":333,"label":335,"linkedItem":336,"externalUrl":14,"newWindow":338,"style":340,"queryParameter":14},{"id":334},"e16413bd-44ac-56f4-9567-59336a6120c8","Group Fares",{"__typename":43,"slug":337},"rail-fares-and-tickets\u002Fgroups-and-tours",{"items":339},[],{"items":341},[],{"__typename":6,"_system_":343,"label":345,"linkedItem":346,"externalUrl":14,"newWindow":348,"style":350,"queryParameter":14},{"id":344},"69881b8e-d6bc-53cb-ad94-9f8bdb7998ad","Special Offers",{"__typename":43,"slug":347},"rail-fares-and-tickets\u002Fspecial-offers",{"items":349},[],{"items":351},[],{"__typename":24,"_system_":353,"label":355,"slug":356,"queryParameter":14,"subpages":357},{"id":354},"22662007-5b1c-5953-ba55-4016159a0691","Station Info","station-info",{"items":358},[359,406,452],{"__typename":24,"_system_":360,"label":362,"slug":363,"queryParameter":14,"link":10,"subpages":364},{"id":361},"cfe9920a-38c9-52b1-8a19-84ad2a5f732e","Station Information","station-information",{"items":365},[366,376,386,396],{"__typename":6,"_system_":367,"label":369,"linkedItem":370,"externalUrl":14,"newWindow":372,"style":374,"queryParameter":14},{"id":368},"18917df4-140f-53c8-bbd7-3f3d4b711508","Find a Station",{"__typename":43,"slug":371},"travel-information\u002Ffind-a-station",{"items":373},[],{"items":375},[],{"__typename":6,"_system_":377,"label":379,"linkedItem":380,"externalUrl":14,"newWindow":382,"style":384,"queryParameter":14},{"id":378},"7e45971e-8516-5e74-9e35-f4a4f4075d35","Car Parking",{"__typename":43,"slug":381},"travel-information\u002Fstation-car-parking",{"items":383},[],{"items":385},[],{"__typename":6,"_system_":387,"label":389,"linkedItem":390,"externalUrl":14,"newWindow":392,"style":394,"queryParameter":14},{"id":388},"e194d3b3-fc69-55d6-bc0f-4be24264b881","Bicycle Information",{"__typename":43,"slug":391},"travel-information\u002Fbicycle-information-for-rail-travel",{"items":393},[],{"items":395},[],{"__typename":6,"_system_":397,"label":399,"linkedItem":400,"externalUrl":14,"newWindow":402,"style":404,"queryParameter":14},{"id":398},"d939a7c1-35c7-5f9c-b5d2-656d404ee65a","Luggage Information",{"__typename":43,"slug":401},"travel-information\u002Fluggage",{"items":403},[],{"items":405},[],{"__typename":24,"_system_":407,"label":409,"slug":410,"queryParameter":14,"link":10,"subpages":411},{"id":408},"20ab8674-8589-52f7-afb2-8725a66b80d8","Accessible Travel","accessible-travel",{"items":412},[413,423,433,442],{"__typename":6,"_system_":414,"label":416,"linkedItem":417,"externalUrl":14,"newWindow":419,"style":421,"queryParameter":14},{"id":415},"7db6ed72-ecfb-52d9-bf73-8a32b84a66d6","Accessibility On-board",{"__typename":43,"slug":418},"travel-information\u002Faccessibility-onboard-trains\u002Fplanning-your-journey",{"items":420},[],{"items":422},[],{"__typename":6,"_system_":424,"label":426,"linkedItem":427,"externalUrl":14,"newWindow":429,"style":431,"queryParameter":14},{"id":425},"7768d9b2-f69c-5368-8957-5ca093b78797","Alerts for Lifts and Escalators",{"__typename":43,"slug":428},"travel-information\u002Faccessibility-onboard-trains\u002Flifts-and-escalators-reports",{"items":430},[],{"items":432},[],{"__typename":6,"_system_":434,"label":436,"linkedItem":437,"externalUrl":14,"newWindow":438,"style":440,"queryParameter":14},{"id":435},"676aa0e8-e07d-5c23-a78f-ff6a51ba4faf","Accessibility Policies",{"__typename":43,"slug":418},{"items":439},[],{"items":441},[],{"__typename":6,"_system_":443,"label":445,"linkedItem":446,"externalUrl":14,"newWindow":448,"style":450,"queryParameter":14},{"id":444},"0ee98352-750f-59f0-b3a5-7c681a9dbead","Disability Assistance and Feedback",{"__typename":43,"slug":447},"contact-us\u002Faccessibility-onboard",{"items":449},[],{"items":451},[],{"__typename":24,"_system_":453,"label":455,"slug":456,"queryParameter":14,"link":10,"subpages":457},{"id":454},"f44a5e64-0449-5e9c-86ef-905771932767","Tourist Information","tourist-information",{"items":458},[459,469,479,490,500,510,520],{"__typename":6,"_system_":460,"label":462,"linkedItem":463,"externalUrl":14,"newWindow":465,"style":467,"queryParameter":14},{"id":461},"acaa26cc-4b43-5d38-9faa-628b1b3e8702","Travel Ireland by Rail",{"__typename":43,"slug":464},"travel-information\u002Fvisiting-ireland",{"items":466},[],{"items":468},[],{"__typename":6,"_system_":470,"label":472,"linkedItem":473,"externalUrl":14,"newWindow":475,"style":477,"queryParameter":14},{"id":471},"3c0c364c-8db2-595c-a9c5-a6ad4a66b0b0","The Royal Canal Greenway Route",{"__typename":43,"slug":474},"travel-information\u002Fvisiting-ireland\u002Froyal-canal-greenway",{"items":476},[],{"items":478},[],{"__typename":6,"_system_":480,"label":482,"linkedItem":483,"externalUrl":14,"newWindow":486,"style":488,"queryParameter":14},{"id":481},"24c09e80-7866-5e4b-8dc4-7a262dde552a","Dublin Airport Express",{"__typename":484,"slug":485},"Offer","offer\u002Fairport-connections",{"items":487},[],{"items":489},[],{"__typename":6,"_system_":491,"label":493,"linkedItem":494,"externalUrl":14,"newWindow":496,"style":498,"queryParameter":14},{"id":492},"e7e196e3-b2fb-59fc-92a4-dc4aff92e6ea","SailRail",{"__typename":43,"slug":495},"rail-fares-and-tickets\u002Fsailrail",{"items":497},[],{"items":499},[],{"__typename":6,"_system_":501,"label":503,"linkedItem":504,"externalUrl":14,"newWindow":506,"style":508,"queryParameter":14},{"id":502},"5effa3d8-de72-53b4-bf41-1e6b0f05fd64","InterRail",{"__typename":43,"slug":505},"rail-fares-and-tickets\u002Finterrail-explore-europe",{"items":507},[],{"items":509},[],{"__typename":6,"_system_":511,"label":513,"linkedItem":514,"externalUrl":14,"newWindow":516,"style":518,"queryParameter":14},{"id":512},"fd349199-7d15-5d3b-869a-cf1bcc58e60a","Railtours",{"__typename":43,"slug":515},"rail-fares-and-tickets\u002Fgroups-and-tours\u002Frailtours",{"items":517},[],{"items":519},[],{"__typename":6,"_system_":521,"label":267,"linkedItem":523,"externalUrl":14,"newWindow":524,"style":526,"queryParameter":528},{"id":522},"c2a73bfc-3815-5b5f-9f19-b25f2bd508a8",{"__typename":43,"slug":248},{"items":525},[],{"items":527},[],"#Tourist%20Tickets",{"__typename":24,"_system_":530,"label":532,"slug":533,"queryParameter":14,"subpages":534},{"id":531},"98714095-010f-5005-a24e-a2aba2a1438b","On the Train","on-the-train",{"items":535},[536],{"__typename":24,"_system_":537,"label":532,"slug":533,"queryParameter":14,"link":10,"subpages":539},{"id":538},"d92b5d30-0665-5b02-81a9-c72cc591d2b1",{"items":540},[541,551,560,570,579,589,598],{"__typename":6,"_system_":542,"label":544,"linkedItem":545,"externalUrl":14,"newWindow":547,"style":549,"queryParameter":14},{"id":543},"c45f60ab-5f74-5b04-8f5d-957a4887bc58","Catering On-board",{"__typename":43,"slug":546},"travel-information\u002Frail-onboard-catering",{"items":548},[],{"items":550},[],{"__typename":6,"_system_":552,"label":416,"linkedItem":554,"externalUrl":14,"newWindow":556,"style":558,"queryParameter":14},{"id":553},"3d7fec11-c5f6-5fb6-8ff6-2595ce77bdfb",{"__typename":43,"slug":555},"travel-information\u002Faccessibility-onboard-trains",{"items":557},[],{"items":559},[],{"__typename":6,"_system_":561,"label":563,"linkedItem":564,"externalUrl":14,"newWindow":566,"style":568,"queryParameter":14},{"id":562},"08581572-b5d1-5ae6-891c-2c11c57c07fb","Wi-Fi and Power On-board",{"__typename":43,"slug":565},"travel-information\u002Fwifi-and-power",{"items":567},[],{"items":569},[],{"__typename":6,"_system_":571,"label":573,"linkedItem":574,"externalUrl":14,"newWindow":575,"style":577,"queryParameter":14},{"id":572},"d1e12060-41ea-5875-9e5d-3910c5bfeb4b","Luggage On-board",{"__typename":43,"slug":401},{"items":576},[],{"items":578},[],{"__typename":6,"_system_":580,"label":582,"linkedItem":583,"externalUrl":14,"newWindow":585,"style":587,"queryParameter":14},{"id":581},"d77b90c7-ff85-5e14-9efc-8d588140e39f","Pets On-board",{"__typename":43,"slug":584},"travel-information\u002Ftravelling-with-animals",{"items":586},[],{"items":588},[],{"__typename":6,"_system_":590,"label":592,"linkedItem":593,"externalUrl":14,"newWindow":594,"style":596,"queryParameter":14},{"id":591},"429478c2-48f9-5d29-899f-1a499ddfe573","Bicycles On-board",{"__typename":43,"slug":391},{"items":595},[],{"items":597},[],{"__typename":6,"_system_":599,"label":601,"linkedItem":602,"externalUrl":14,"newWindow":604,"style":606,"queryParameter":14},{"id":600},"24d459bb-1def-5109-b536-2341c539b374","First Class Travel",{"__typename":43,"slug":603},"rail-fares-and-tickets\u002Ffirst-class-travel",{"items":605},[],{"items":607},[],{"__typename":24,"_system_":609,"label":611,"slug":612,"queryParameter":14,"subpages":613},{"id":610},"f3e8252c-4148-5c35-aff8-7417372f401b","Support","support",{"items":614},[615,650],{"__typename":24,"_system_":616,"label":618,"slug":619,"queryParameter":14,"link":10,"subpages":620},{"id":617},"e95362b3-219c-5406-8bc9-042041f61671","Help","help",{"items":621},[622,632,640],{"__typename":6,"_system_":623,"label":625,"linkedItem":626,"externalUrl":14,"newWindow":628,"style":630,"queryParameter":14},{"id":624},"95227aa1-951f-5deb-b83a-c48bf6fc18d1","Frequently Asked Questions",{"__typename":43,"slug":627},"contact-us\u002Ffaqs",{"items":629},[],{"items":631},[],{"__typename":6,"_system_":633,"label":369,"linkedItem":635,"externalUrl":14,"newWindow":636,"style":638,"queryParameter":14},{"id":634},"9a492eee-dc94-5883-a3e3-6687a46a498a",{"__typename":43,"slug":371},{"items":637},[],{"items":639},[],{"__typename":6,"_system_":641,"label":643,"linkedItem":644,"externalUrl":14,"newWindow":646,"style":648,"queryParameter":14},{"id":642},"90a6d9ba-ae0b-5958-af60-ba7c5bdb0e6c","Pay Fines",{"__typename":43,"slug":645},"rail-fares-and-tickets\u002Ffixed-payment-notice",{"items":647},[],{"items":649},[],{"__typename":24,"_system_":651,"label":653,"slug":654,"queryParameter":14,"link":10,"subpages":655},{"id":652},"c9ffd7ce-7419-5702-92cb-f7b15f4d30e5","Contact Us","contact-us",{"items":656},[657,665,679,689,697,707,717],{"__typename":6,"_system_":658,"label":653,"linkedItem":660,"externalUrl":14,"newWindow":661,"style":663,"queryParameter":14},{"id":659},"274a1940-e1cc-587a-8c21-62560b4415ff",{"__typename":43,"slug":654},{"items":662},[],{"items":664},[],{"__typename":6,"_system_":666,"label":668,"linkedItem":669,"externalUrl":14,"newWindow":671,"style":677,"queryParameter":14},{"id":667},"b14247b8-3f7b-51d0-946a-ae17c17b8b75","Customer Care",{"__typename":43,"slug":670},"contact-us\u002Fcustomer-service-section",{"items":672},[673],{"_system_":674},{"codename":675,"name":676},"yes","Yes",{"items":678},[],{"__typename":6,"_system_":680,"label":682,"linkedItem":683,"externalUrl":14,"newWindow":685,"style":687,"queryParameter":14},{"id":681},"2d89f18b-0b28-5e1a-9161-964521260b6e","Emergency Contact Details",{"__typename":43,"slug":684},"contact-us\u002Femergency-contact-details",{"items":686},[],{"items":688},[],{"__typename":6,"_system_":690,"label":445,"linkedItem":692,"externalUrl":14,"newWindow":693,"style":695,"queryParameter":14},{"id":691},"52bfb708-cd63-554d-9875-144f9d4e6c93",{"__typename":43,"slug":447},{"items":694},[],{"items":696},[],{"__typename":6,"_system_":698,"label":700,"linkedItem":701,"externalUrl":14,"newWindow":703,"style":705,"queryParameter":14},{"id":699},"3ae49f15-6a1a-58cb-8158-45299c36c796","Report Website or App Issues",{"__typename":43,"slug":702},"contact-us\u002Freport-website-error",{"items":704},[],{"items":706},[],{"__typename":6,"_system_":708,"label":710,"linkedItem":711,"externalUrl":14,"newWindow":713,"style":715,"queryParameter":14},{"id":709},"45790a1c-c27d-5f3a-958e-9be363c270f7","Lost and Found",{"__typename":43,"slug":712},"contact-us\u002Flost-property",{"items":714},[],{"items":716},[],{"__typename":6,"_system_":718,"label":720,"linkedItem":721,"externalUrl":14,"newWindow":723,"style":725,"queryParameter":14},{"id":719},"f00a7f83-5780-5af4-9670-764e1cab6bd4","Report a Lift or Escalator Issue",{"__typename":43,"slug":722},"contact-us\u002Freport-lift-and-escalator-issue",{"items":724},[],{"items":726},[],[728,734,742,749],{"__typename":6,"_system_":729,"label":34,"linkedItem":731,"externalUrl":14,"newWindow":732,"queryParameter":14},{"id":730},"77c2b764-2b0a-5e05-bfaf-afb7a5fdd3ce",{"__typename":43,"slug":44},{"items":733},[],{"__typename":6,"_system_":735,"label":737,"linkedItem":738,"externalUrl":14,"newWindow":740,"queryParameter":14},{"id":736},"2c0dc499-9601-5460-ab48-a140f45dfb4a","Fares and Tickets",{"__typename":43,"slug":739},"rail-fares-and-tickets",{"items":741},[],{"__typename":6,"_system_":743,"label":62,"linkedItem":745,"externalUrl":14,"newWindow":747,"queryParameter":14},{"id":744},"3c8c3225-b496-5f74-92b0-38e491cabd34",{"__typename":43,"slug":746},"train-timetables",{"items":748},[],{"__typename":6,"_system_":750,"label":752,"linkedItem":753,"externalUrl":14,"newWindow":755,"queryParameter":14},{"id":751},"23304fe7-3fb0-58a2-8d42-b0bdcaf51847","Travel Information",{"__typename":43,"slug":754},"travel-information\u002Fyour-travel",{"items":756},[],[758,866,891],{"__typename":24,"_system_":759,"label":761,"slug":762,"queryParameter":14,"link":763,"subpages":768},{"id":760},"82621dd4-0a6b-5ee5-9035-c08bcdbdd6fa","About","about",{"label":761,"linkedItem":764,"externalUrl":14,"newWindow":766,"queryParameter":14},{"__typename":43,"slug":765},"about-us",{"items":767},[],{"items":769},[770,778,786,794,802,810,818,826,834,842,850,858],{"__typename":6,"_system_":771,"label":773,"linkedItem":774,"externalUrl":14,"newWindow":776,"queryParameter":14},{"id":772},"e4e3167d-7bee-56a5-bef7-8cbdc33b9452","Career Opportunities",{"__typename":43,"slug":775},"about-us\u002Fcompany-information\u002Fcareer-opportunities-at-iarnrod-eireann",{"items":777},[],{"__typename":6,"_system_":779,"label":781,"linkedItem":782,"externalUrl":14,"newWindow":784,"queryParameter":14},{"id":780},"100c1a4f-e56c-5614-ab2c-e36fa82a06e0","Company Info",{"__typename":43,"slug":783},"about-us\u002Fcompany-information",{"items":785},[],{"__typename":6,"_system_":787,"label":789,"linkedItem":790,"externalUrl":14,"newWindow":792,"queryParameter":14},{"id":788},"cc1d1482-ef66-58af-ae93-1f9801e378f9","Customer Charter",{"__typename":43,"slug":791},"legal\u002Fpassengers-charter",{"items":793},[],{"__typename":6,"_system_":795,"label":797,"linkedItem":798,"externalUrl":14,"newWindow":800,"queryParameter":14},{"id":796},"bf0dbbee-7e22-5959-8f94-e5206626de7e","Fleet",{"__typename":43,"slug":799},"about-us\u002Fiarnrod-eireann-fleet",{"items":801},[],{"__typename":6,"_system_":803,"label":805,"linkedItem":806,"externalUrl":14,"newWindow":808,"queryParameter":14},{"id":804},"c9ecbe50-1b8a-5f0f-bcb8-614b8bc6c85e","Freight",{"__typename":43,"slug":807},"about-us\u002Fiarnrod-eireann-services\u002Ffreight",{"items":809},[],{"__typename":6,"_system_":811,"label":813,"linkedItem":814,"externalUrl":14,"newWindow":816,"queryParameter":14},{"id":812},"475d87d3-3a10-5301-9b0f-c88a614f0cb5","Group Property",{"__typename":43,"slug":815},"about-us\u002Fcie-group-property",{"items":817},[],{"__typename":6,"_system_":819,"label":821,"linkedItem":822,"externalUrl":14,"newWindow":824,"queryParameter":14},{"id":820},"f81b4dae-e539-539b-9995-f3e1b2be52cd","Infrastructure",{"__typename":43,"slug":823},"about-us\u002Fiarnrod-eireann-infrastructure",{"items":825},[],{"__typename":6,"_system_":827,"label":829,"linkedItem":830,"externalUrl":14,"newWindow":832,"queryParameter":14},{"id":828},"53542475-48af-53de-af72-7c801475c8f2","Network Statement",{"__typename":43,"slug":831},"about-us\u002Fiarnrod-eireann-network-statement",{"items":833},[],{"__typename":6,"_system_":835,"label":837,"linkedItem":838,"externalUrl":14,"newWindow":840,"queryParameter":14},{"id":836},"dfd86cf9-32ee-50aa-8485-eb209ff33774","Projects and Investment",{"__typename":43,"slug":839},"about-us\u002Fiarnrod-eireann-projects-and-investments",{"items":841},[],{"__typename":6,"_system_":843,"label":845,"linkedItem":846,"externalUrl":14,"newWindow":848,"queryParameter":14},{"id":844},"1a87c10d-ae20-5cda-9dbf-d5e2deb4adb9","Safety and Security",{"__typename":43,"slug":847},"about-us\u002Fcompany-information\u002Fiarnrod-eireann-safety-and-security",{"items":849},[],{"__typename":6,"_system_":851,"label":853,"linkedItem":854,"externalUrl":14,"newWindow":856,"queryParameter":14},{"id":852},"deb875c8-d31e-51d2-b4ed-d18ddbfc24f4","Services",{"__typename":43,"slug":855},"about-us\u002Fiarnrod-eireann-services",{"items":857},[],{"__typename":6,"_system_":859,"label":861,"linkedItem":862,"externalUrl":14,"newWindow":864,"queryParameter":14},{"id":860},"59d5037e-d55a-56cb-812c-4c09c5beb26d","Train Performance",{"__typename":43,"slug":863},"about-us\u002Ftrain-punctuality-reliability-performance",{"items":865},[],{"__typename":24,"_system_":867,"label":611,"slug":869,"queryParameter":14,"link":10,"subpages":870},{"id":868},"33292a59-891c-5780-a7e7-30e08486a543","fares-tickets",{"items":871},[872,878,884],{"__typename":6,"_system_":873,"label":625,"linkedItem":875,"externalUrl":14,"newWindow":876,"queryParameter":14},{"id":874},"180f48b5-540e-5db6-a949-c787bda1b607",{"__typename":43,"slug":627},{"items":877},[],{"__typename":6,"_system_":879,"label":653,"linkedItem":881,"externalUrl":14,"newWindow":882,"queryParameter":14},{"id":880},"7c1df6cb-29bd-598b-aa3f-6e35ccd83737",{"__typename":43,"slug":654},{"items":883},[],{"__typename":6,"_system_":885,"label":887,"linkedItem":888,"externalUrl":14,"newWindow":889,"queryParameter":14},{"id":886},"3253a7ca-28ac-5605-bf9a-b5733ed6edaa","Disability Feedback and Assistance",{"__typename":43,"slug":447},{"items":890},[],{"__typename":24,"_system_":892,"label":894,"slug":63,"queryParameter":14,"link":10,"subpages":895},{"id":893},"ff22565f-2809-560a-8b2b-839049d890d6","Stay up to date",{"items":896},[897],{"__typename":6,"_system_":898,"label":900,"linkedItem":901,"externalUrl":14,"newWindow":903,"queryParameter":14},{"id":899},"e899a22f-ff79-5ec9-8b81-aed82abb427d","News",{"__typename":43,"slug":902},"news",{"items":904},[],[906,914,922],{"__typename":6,"_system_":907,"label":909,"linkedItem":910,"externalUrl":14,"newWindow":912,"queryParameter":14},{"id":908},"1db53d96-c417-559e-9cfc-9ec291dcb540","Legal",{"__typename":43,"slug":911},"legal",{"items":913},[],{"__typename":6,"_system_":915,"label":917,"linkedItem":918,"externalUrl":14,"newWindow":920,"queryParameter":14},{"id":916},"80a37bf5-73cf-521e-85e6-8f4be84985aa","Privacy and Cookie Policy",{"__typename":43,"slug":919},"legal\u002Fterms-of-use-privacy-statement-cookie-policy",{"items":921},[],{"__typename":6,"_system_":923,"label":925,"linkedItem":926,"externalUrl":14,"newWindow":928,"queryParameter":14},{"id":924},"be3f6534-7d2d-5f0a-b5b4-36d69885e96c","Web Accessibility",{"__typename":43,"slug":927},"legal\u002Fwebsite-accessibility",{"items":929},[],{"title":931,"subpages":932},"About Us",[933,950,1083,1101,1103,1135,1141,1144,1271,1295,1319],{"slug":934,"title":935,"description":14,"date":14,"type":936,"subpages":937},"about-us\u002Frail-bridge-heights-and-level-crossings","Rail Bridge Heights and Level Crossings","page",[938,941,944,947],{"slug":939,"title":940,"description":14,"date":14,"type":936},"about-us\u002Frail-bridge-heights-and-level-crossings\u002Frail-bridge-heights","Rail Bridge Heights",{"slug":942,"title":943,"description":14,"date":14,"type":936},"about-us\u002Frail-bridge-heights-and-level-crossings\u002Fiarnrod-eireann-bridge-height-map","Iarnród Éireann Bridge Height Map",{"slug":945,"title":946,"description":14,"date":14,"type":936},"about-us\u002Frail-bridge-heights-and-level-crossings\u002Frail-level-crossings","Rail Level Crossings",{"slug":948,"title":949,"description":14,"date":14,"type":936},"about-us\u002Frail-bridge-heights-and-level-crossings\u002Fiarnrod-eireann-level-crossing-map","Iarnród Éireann Level Crossing Map",{"slug":783,"title":951,"description":14,"date":14,"type":936,"subpages":952},"Company Information",[953,956,959,962,965,1006,1009,1029,1032,1035,1049,1056,1059,1062,1065,1068,1071,1074,1077],{"slug":954,"title":955,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fadvertise-with-us","Advertise with us",{"slug":957,"title":958,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fanti-corruption-and-anti-bribery-policy","Anti-Corruption and Anti-Bribery Policy",{"slug":960,"title":961,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fiarnrod-eireann-annual-reports","Iarnród Éireann Annual Reports",{"slug":963,"title":964,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fiarnrod-eireann-board-of-directors","Iarnród Éireann Board of Directors",{"slug":775,"title":773,"description":14,"date":14,"type":936,"subpages":966},[967,972,977,981,984,1003],{"slug":968,"title":969,"description":970,"date":971,"type":936},"about-us\u002Fcompany-information\u002Fcareer-opportunities-at-iarnrod-eireann\u002Fsecurity-enforcement-and-compliance-coordinator","Security Enforcement and Compliance Coordinator","Iarnród Éireann Irish Rail are seeking applications for the role of Security Enforcement and Compliance Coordinator. This is an exciting opportunity to join a team that plays a critical role in maintaining safety, security and compliance across the rail network in the Greater Dublin Area.","2026-11-12T16:40:00Z",{"slug":973,"title":974,"description":975,"date":976,"type":936},"about-us\u002Fcompany-information\u002Fcareer-opportunities-at-iarnrod-eireann\u002Fsenior-safety-approvals-specialist","Senior Safety Approvals Specialist","Applications are being invited from suitably qualified candidates for the position of Senior Safety Approvals Specialist, IM Safety Team, Infrastructure Management (IM).","2026-11-09T15:56:00Z",{"slug":978,"title":979,"description":980,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fcareer-opportunities-at-iarnrod-eireann\u002Ftraction-telecoms-and-project-electricians","Traction, Telecoms and Project Electricians","Iarnród Éireann Irish Rail are seeking motivated and safety-focused Electricians to join our team in the areas of Traction, Telecoms and Projects",{"slug":982,"title":983,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fcareer-opportunities-at-iarnrod-eireann\u002Fprogramme-construction-safety-lead-capital-investments","Programme Construction Safety Lead - Capital Investments",{"slug":985,"title":986,"description":14,"date":14,"type":936,"subpages":987},"about-us\u002Fcompany-information\u002Fcareer-opportunities-at-iarnrod-eireann\u002Fiarnrod-eireann-graduate-programme","Iarnród Éireann Graduate Programme 2027",[988,991,994,997,1000],{"slug":989,"title":990,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fcareer-opportunities-at-iarnrod-eireann\u002Fiarnrod-eireann-graduate-programme\u002Felectrical-mechatronic-eng","Graduate Electrical\u002FElectronic and Mechatronic Engineers",{"slug":992,"title":993,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fcareer-opportunities-at-iarnrod-eireann\u002Fiarnrod-eireann-graduate-programme\u002Fbusiness-graduate-programme","Business Graduate Programme",{"slug":995,"title":996,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fcareer-opportunities-at-iarnrod-eireann\u002Fiarnrod-eireann-graduate-programme\u002Fcivil-engineering-graduate-programme","Civil Engineering Graduate Programme",{"slug":998,"title":999,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fcareer-opportunities-at-iarnrod-eireann\u002Fiarnrod-eireann-graduate-programme\u002Fenvironmental-graduate-programme","Environmental Graduate Programme",{"slug":1001,"title":1002,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fcareer-opportunities-at-iarnrod-eireann\u002Fiarnrod-eireann-graduate-programme\u002Finformation-communications-technology-graduate-pro","Information Communications Technology Graduate Programme",{"slug":1004,"title":1005,"description":1005,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fcareer-opportunities-at-iarnrod-eireann\u002Flevel-crossing-control-operators","Level Crossing Control Operators (LCCO) and Gatekeepers - IM Department",{"slug":1007,"title":1008,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fcie-code-of-conduct","Iarnród Éireann Code of Conduct",{"slug":1010,"title":1011,"description":14,"date":14,"type":936,"subpages":1012},"about-us\u002Fcompany-information\u002Fsustainability","Sustainability at Iarnród Éireann",[1013,1016,1019,1022,1025],{"slug":1014,"title":1015,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fsustainability\u002Fenvironmental-sustainability","Environmental Sustainability",{"slug":1017,"title":1018,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fsustainability\u002Fsocial-sustainability","Social Sustainability",{"slug":1020,"title":1021,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fsustainability\u002Feconomic-sustainability","Economic Sustainability",{"slug":1023,"title":1024,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fsustainability\u002Fsustainable-development-goal","Sustainable Development Goal (SDG) Champion",{"slug":1026,"title":1027,"description":1028,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fsustainability\u002Fcarbon-footprint-calculator","Carbon Footprint Calculator","Iarnród Éireann Irish Rail have implemented a Carbon Footprint Calculator feature within our Journey Planner and Mobile Apps. This will allow users to see approximate CO₂ their planned journey by train compares to a similar journey made by car.",{"slug":1030,"title":1031,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fequality-and-diversity-at-iarnrod-eireann","Equality and Diversity at Iarnród Éireann",{"slug":1033,"title":1034,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Ffilming-iarnrod-eireann-services-and-property","Filming Iarnród Éireann Services and Property",{"slug":1036,"title":1037,"description":14,"date":14,"type":936,"subpages":1038},"about-us\u002Fcompany-information\u002Ffreedom-of-information","Freedom of Information",[1039,1042],{"slug":1040,"title":1041,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Ffreedom-of-information\u002Frequest-records","FOI Request Records",{"slug":1043,"title":1044,"description":14,"date":14,"type":936,"subpages":1045},"about-us\u002Fcompany-information\u002Ffreedom-of-information\u002Facccess-information-environment","Access to Information on the Environment",[1046],{"slug":1047,"title":1048,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Ffreedom-of-information\u002Facccess-information-environment\u002Frequests-records","AIE Request Records",{"slug":1050,"title":1051,"description":14,"date":14,"type":936,"subpages":1052},"about-us\u002Fcompany-information\u002Fiarnrod-eireann-heritage-and-enthusiasts","Iarnród Éireann Heritage and Enthusiasts",[1053],{"slug":1054,"title":1055,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fiarnrod-eireann-heritage-and-enthusiasts\u002Fheritage-maps","Heritage Maps",{"slug":1057,"title":1058,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fiarnrod-eireann-strategy","Iarnród Éireann Strategy",{"slug":1060,"title":1061,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fiarnrod-eireann-management-team","Iarnród Éireann Management Team",{"slug":1063,"title":1064,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fiarnrod-eireann-procurement-information","Procurement at Iarnród Éireann",{"slug":1066,"title":1067,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Ftrain-driver-examination-centre","Iarnród Éireann Train Driver Examination Centre",{"slug":1069,"title":1070,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fiarnrod-eireann-train-driver-training-centre","Iarnród Éireann Train Driver Training Centre",{"slug":1072,"title":1073,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fkids-zone","Kids Zone",{"slug":1075,"title":1076,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fprotected-disclosure-policy-and-procedures","Protected Disclosure Policy and Procedures for Iarnród Éireann",{"slug":847,"title":1078,"description":14,"date":14,"type":936,"subpages":1079},"Iarnród Éireann Safety and Security",[1080],{"slug":1081,"title":1082,"description":14,"date":14,"type":936},"about-us\u002Fcompany-information\u002Fiarnrod-eireann-safety-and-security\u002Fiarnrod-eireann-rule-book","Iarnród Éireann Rule Book",{"slug":799,"title":1084,"description":14,"date":14,"type":936,"subpages":1085},"Iarnród Éireann Fleet",[1086,1089,1092,1095,1098],{"slug":1087,"title":1088,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-fleet\u002Fdart-fleet","DART Fleet Information",{"slug":1090,"title":1091,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-fleet\u002Fcommuter-fleet","Commuter Fleet Information",{"slug":1093,"title":1094,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-fleet\u002Ffreight-fleet","Freight Fleet Information",{"slug":1096,"title":1097,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-fleet\u002Fintercity-fleet","InterCity Fleet Information",{"slug":1099,"title":1100,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-fleet\u002Flocomotives-fleet","Locomotives Fleet Information",{"slug":815,"title":1102,"description":14,"date":14,"type":936},"CIE Group Property",{"slug":823,"title":1104,"description":14,"date":14,"type":936,"subpages":1105},"Iarnród Éireann Infrastructure",[1106,1109,1113,1123,1126,1129,1132],{"slug":1107,"title":1108,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-infrastructure\u002Fiarnrod-eireann-biodiversity-guidelines","Iarnród Éireann Biodiversity Guidelines",{"slug":1110,"title":1111,"description":14,"date":1112,"type":936},"about-us\u002Fiarnrod-eireann-infrastructure\u002Fiarnrod-eireann-biodiversity-guidelines\u002Fiarnrod-eireann-night-time-track-works","Iarnród Éireann Night-time Track Works","2026-11-04T00:00:00Z",{"slug":1114,"title":1115,"description":14,"date":14,"type":936,"subpages":1116},"about-us\u002Fiarnrod-eireann-infrastructure\u002Fstrategic-noise-maps","Iarnród Éireann Strategic Noise Maps",[1117,1120],{"slug":1118,"title":1119,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-infrastructure\u002Fstrategic-noise-maps\u002Ffaqs","FAQs relating to Interpretation of Strategic Noise Maps",{"slug":1121,"title":1122,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-infrastructure\u002Fstrategic-noise-maps\u002Fgeneral-information","Information on Strategic Noise Mapping",{"slug":1124,"title":1125,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-infrastructure\u002Fthird-party-works","Iarnród Éireann Third Party Works",{"slug":1127,"title":1128,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-infrastructure\u002Ftrees-vegetation-on-railway-property","Trees and Vegetation on Railway Property",{"slug":1130,"title":1131,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-infrastructure\u002Fiarnrod-eireann-contractor-pts","Iarnród Éireann Contractor PTS",{"slug":1133,"title":1134,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-infrastructure\u002Finfrastructure-contact-details","Infrastructure Contact Details",{"slug":831,"title":1136,"description":14,"date":14,"type":936,"subpages":1137},"Iarnród Éireann Network Statement",[1138],{"slug":1139,"title":1140,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-network-statement\u002Fweekly-circular-information","Weekly Circular Information",{"slug":1142,"title":1143,"description":14,"date":14,"type":936},"about-us\u002Fnewsletter","Newsletter",{"slug":839,"title":1145,"description":14,"date":14,"type":936,"subpages":1146},"Iarnród Éireann Projects and Investments",[1147,1169,1173,1185,1188,1201,1224,1227,1240,1243,1246,1249,1252,1255,1258,1268],{"slug":1148,"title":1149,"description":14,"date":14,"type":936,"subpages":1150},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Ffour-north-project","FourNorth Project",[1151,1154,1157,1160,1163,1166],{"slug":1152,"title":1153,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Ffour-north-project\u002Fwhy-four-north-matters","About Four North",{"slug":1155,"title":1156,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Ffour-north-project\u002Fproject-benefits","Key Benefits",{"slug":1158,"title":1159,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Ffour-north-project\u002Fstrategic-alignment","Strategic Alignment",{"slug":1161,"title":1162,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Ffour-north-project\u002Fpublic-consultation","Public Engagement",{"slug":1164,"title":1165,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Ffour-north-project\u002Fnext-steps","Next Steps",{"slug":1167,"title":1168,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Ffour-north-project\u002Ffaqs","Four North: FAQ and Key Messages",{"slug":1170,"title":1171,"description":1172,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fconnect-project","CONNECT","CONNECT is a project that plans for significant enhancements to Intercity services across Ireland  ",{"slug":1174,"title":1175,"description":14,"date":14,"type":936,"subpages":1176},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fnavan-railway-line","Navan Railway",[1177,1181],{"slug":1178,"title":1179,"description":1180,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fnavan-railway-line\u002Fnspc1-epr","Public Consultation 1","Iarnród Éireann would welcome your feedback on the Emerging Preferred Route for Navan Railway",{"slug":1182,"title":1183,"description":1184,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fnavan-railway-line\u002Fnspc2","Public Consultation 2","Preferred Route Consultation Page ",{"slug":1186,"title":1187,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fgreen-drift","Berth 3 Upgrade Project: Green Drift",{"slug":1189,"title":1190,"description":14,"date":14,"type":936,"subpages":1191},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fcork-area-commuter-rail","Cork Area Commuter Rail",[1192,1195,1198],{"slug":1193,"title":1194,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fcork-area-commuter-rail\u002Fglounthaune-to-midleton-twin-track-project","Glounthaune to Midleton Twin Track Project",{"slug":1196,"title":1197,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fcork-area-commuter-rail\u002Fkent-station-through-platform","Kent Station Through Platform",{"slug":1199,"title":1200,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fcork-area-commuter-rail\u002Fsignalling-and-communications-upgrade","Signalling and Communications Upgrade",{"slug":1202,"title":1203,"description":14,"date":14,"type":936,"subpages":1204},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fecripp","East Coast Railway Infrastructure Protection Projects ECRIPP",[1205],{"slug":1206,"title":1207,"description":14,"date":14,"type":936,"subpages":1208},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fecripp\u002Femerging-preferred-scheme","Public Consultation 2 - Preferred Scheme",[1209,1212,1215,1218,1221],{"slug":1210,"title":1211,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fecripp\u002Femerging-preferred-scheme\u002Fbray-head-to-greystones-north-beach","Bray Head to Greystones North Beach",{"slug":1213,"title":1214,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fecripp\u002Femerging-preferred-scheme\u002Fkilcoole-to-newcastle","Kilcoole to Newcastle",{"slug":1216,"title":1217,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fecripp\u002Femerging-preferred-scheme\u002Fmerrion-gates-to-seapoint-beach","Merrion Gates to Seapoint Beach",{"slug":1219,"title":1220,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fecripp\u002Femerging-preferred-scheme\u002Fnewcastle-to-wicklow-murrough","Newcastle to Wicklow Murrough",{"slug":1222,"title":1223,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fecripp\u002Femerging-preferred-scheme\u002Fwhiterock-beach-to-south-killiney","Whiterock Beach to South Killiney",{"slug":1225,"title":1226,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Foranmore-station","Oranmore Station",{"slug":1228,"title":1229,"description":14,"date":14,"type":936,"subpages":1230},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fnew-stations","New Stations",[1231,1234,1237],{"slug":1232,"title":1233,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fnew-stations\u002Fkylemore-station","Kylemore Station",{"slug":1235,"title":1236,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fnew-stations\u002Fcabra","Cabra Station",{"slug":1238,"title":1239,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fnew-stations\u002Fmoyross","Moyross Station Project",{"slug":1241,"title":1242,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Frosslare-europort-ore","Rosslare Europort - Offshore Renewable Energy Hub",{"slug":1244,"title":1245,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fwaterford-north-quays","Waterford North Quays",{"slug":1247,"title":1248,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fceannt-station-redevelopment","Ceannt Station Redevelopment",{"slug":1250,"title":1251,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Flimerick-to-foynes-freight-line","Limerick to Foynes Freight Line",{"slug":1253,"title":1254,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fcork-line-level-crossings-project","Cork Line Level Crossings Project",{"slug":1256,"title":1257,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Finvestment-new-trains","Investment in New Trains",{"slug":1259,"title":1260,"description":14,"date":14,"type":936,"subpages":1261},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fdart-programme","DART+ Programme",[1262,1265],{"slug":1263,"title":1264,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fdart-programme\u002Fdart-west-public-consultation","DART+ West Public Consultation",{"slug":1266,"title":1267,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fdart-programme\u002Ffleet-investment","DART+ Fleet – Investment in New Trains",{"slug":1269,"title":1270,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fthe-big-lift-improvement","The Big Lift Improvement",{"slug":855,"title":1272,"description":14,"date":14,"type":936,"subpages":1273},"Iarnród Éireann Services",[1274,1277,1280,1289,1292],{"slug":1275,"title":1276,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-services\u002Fdart-commuter","Iarnród Éireann DART and Commuter Services",{"slug":1278,"title":1279,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-services\u002Fiarnrod-eireann-catering","Iarnród Éireann Catering",{"slug":807,"title":1281,"description":14,"date":14,"type":936,"subpages":1282},"Iarnród Éireann Irish Rail Freight",[1283,1286],{"slug":1284,"title":1285,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-services\u002Ffreight\u002Fbulk-freight-intermodal","Bulk Freight and Intermodal Business",{"slug":1287,"title":1288,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-services\u002Ffreight\u002Fnavigator-freight-logistics-services","Navigator Freight Logistics Services",{"slug":1290,"title":1291,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-services\u002Fintercity","Iarnród Éireann InterCity Services",{"slug":1293,"title":1294,"description":14,"date":14,"type":936},"about-us\u002Fiarnrod-eireann-services\u002Frosslare-europort","Rosslare Europort",{"slug":863,"title":1296,"description":14,"date":14,"type":936,"subpages":1297},"Train Punctuality and Reliability Performance",[1298,1301,1304,1307,1310,1313,1316],{"slug":1299,"title":1300,"description":14,"date":14,"type":936},"about-us\u002Ftrain-punctuality-reliability-performance\u002F2025","2025 Train Punctuality and Reliability Performance",{"slug":1302,"title":1303,"description":14,"date":14,"type":936},"about-us\u002Ftrain-punctuality-reliability-performance\u002F2024","2024 Train Punctuality and Reliability Performance",{"slug":1305,"title":1306,"description":14,"date":14,"type":936},"about-us\u002Ftrain-punctuality-reliability-performance\u002F2023","2023 Train Punctuality and Reliability Performance",{"slug":1308,"title":1309,"description":14,"date":14,"type":936},"about-us\u002Ftrain-punctuality-reliability-performance\u002F2022","2022 Train Punctuality and Reliability Performance",{"slug":1311,"title":1312,"description":14,"date":14,"type":936},"about-us\u002Ftrain-punctuality-reliability-performance\u002F2021","2021 Train Punctuality and Reliability Performance",{"slug":1314,"title":1315,"description":14,"date":14,"type":936},"about-us\u002Ftrain-punctuality-reliability-performance\u002F2020","2020 Train Punctuality and Reliability Performance",{"slug":1317,"title":1318,"description":14,"date":14,"type":936},"about-us\u002Ftrain-punctuality-reliability-performance\u002Fleaves-on-the-line","Leaves On The Railway Line",{"slug":627,"title":1320,"description":14,"date":14,"type":936},"FAQs",{"about-us":931,"about-us\u002Fiarnrod-eireann-projects-and-investments":1145,"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fnavan-railway-line":1175,"about-us\u002Fiarnrod-eireann-projects-and-investments\u002Fnavan-railway-line\u002Fnspc2":1183},{"_document":1323,"_seoSnippet":1684,"redirectTo":10,"hideSidenav":1687,"slug":1182},{"date":10,"description":1184,"title":1183,"body":1324},{"components":1325,"html":1579,"linkedItems":1580},{"items":1326,"totalCount":1578},[1327,1340,1350,1378,1432,1479,1525],{"__typename":1328,"_system_":1329,"content":1332},"ContentBlock",{"codename":1330,"id":1331},"a6176875_604f_0136_e5bc_6d687ec9c1a7","a6176875-604f-0136-e5bc-6d687ec9c1a7",{"html":1333,"components":1334,"linkedItems":1337},"\u003Ch2>Welcome to Navan Railway&nbsp;\u003C\u002Fh2>\n\u003Cp>Iarnród Éireann is progressing the development of the Navan Railway, a proposed new rail connection between Navan and M3 Parkway, connecting with the existing rail network towards Dublin City Centre.&nbsp;\u003C\u002Fp>\n\u003Cp>As an extension of DART+, the proposed railway will provide a frequent, reliable and sustainable public transport option, improving connectivity between communities and supporting future growth in County Meath.&nbsp;\u003C\u002Fp>\n\u003Cp>The first non-statutory public consultation on the Emerging Preferred Route took place between May and July 2026. A total of 1,520 submissions were received from members of the public, landowners, businesses, community groups and other stakeholders.&nbsp;\u003C\u002Fp>\n\u003Cp>The feedback received during the first consultation has been documented in the Non-Statutory Public Consultation No.1 Consultation Findings Report, which provides an overview of the consultation process, the submissions received and the key themes raised.&nbsp;\u003C\u002Fp>\n\u003Cp>\u003Cstrong>&nbsp;Please see - &nbsp;\u003C\u002Fstrong>\u003Ca data-asset-id=\"de00f418-35ec-4094-8993-e5262d58d07b\" href=\"/_kontent/d2e85689-fbf9-010a-a02e-587ed94b5032/3565a939-2fc7-43be-bfc8-b9dadf5447ce/IE000931_NR_NSPC1%20Consultation%20Report_C01.01.pdf\">\u003Cstrong>NSPC1 Consultation Findings Report\u003C\u002Fstrong>\u003C\u002Fa>\u003C\u002Fp>\n\u003Cp>Following a review of the feedback, subsequent engineering, transport planning and environmental assessments have been completed and Iarnród Éireann has identified a Preferred Route for the project.&nbsp;\u003C\u002Fp>\n\u003Cp>The assessments undertaken since the first round of Non-Statutory Public Consultation are described in the “Technical Review of Feedback on the Emerging Preferred Route” including which have resulted in amendments to the Emerging Preferred Route and which have not.&nbsp;\u003C\u002Fp>\n\u003Cp>\u003Cstrong>Please see - \u003C\u002Fstrong>\u003Ca data-asset-id=\"dcddb036-caaa-436b-884b-def313d91215\" href=\"/_kontent/d2e85689-fbf9-010a-a02e-587ed94b5032/ad9ebb03-fffa-45a3-9712-188b728468e9/Navan%20Line%20-%20Technical%20Review%20of%20Feedback%20on%20EPR%20C01.pdf\">\u003Cstrong>Technical Review of Feedback on the Emerging Preferred Route\u003C\u002Fstrong>\u003C\u002Fa>\u003C\u002Fp>\n\u003Ch3>\u003Cstrong>The Preferred Route\u003C\u002Fstrong>&nbsp;\u003C\u002Fh3>\n\u003Cp>The Preferred Route has been informed by public consultation feedback and further technical assessments. The route alignment, new station locations and associated infrastructure will continue to be developed and refined further during the next stage of the project.&nbsp;\u003C\u002Fp>\n\u003Cfigure data-asset-id=\"e0d70818-1741-47f2-9a60-f67742747dd2\" data-image-id=\"e0d70818-1741-47f2-9a60-f67742747dd2\">\u003Cimg src=\"/_kontent/d2e85689-fbf9-010a-a02e-587ed94b5032/7f9ac717-2ec4-4cd7-83bc-532a0b03cbe0/IE000931_Preferred%20Route%20Map_Dual%20Language%20%281%29.png\" data-asset-id=\"e0d70818-1741-47f2-9a60-f67742747dd2\" data-image-id=\"e0d70818-1741-47f2-9a60-f67742747dd2\" alt=\"Preferred Route Ma - Dual Language\">\u003C\u002Ffigure>\n\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"link\" data-codename=\"useful_downloads_and_links_navan_nspc2\">\u003C\u002Fobject>\n\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n58bd9365_d69b_0163_24aa_35d6516e9d80\">\u003C\u002Fobject>",{"items":1335},[1336],{},{"items":1338},[1339],{},{"__typename":1328,"_system_":1341,"content":1344},{"codename":1342,"id":1343},"n83b1205e_9d64_01b2_eb96_14a4239ccfd6","83b1205e-9d64-01b2-eb96-14a4239ccfd6",{"html":1345,"components":1346,"linkedItems":1348},"\u003Ch3>Have Your Say – Preferred Route Public Consultation&nbsp;\u003C\u002Fh3>\n\u003Cp>\u003Cstrong>Consultation Period:\u003C\u002Fstrong> 12 November to 10 December 2026. Submissions will be accepted until close of business, 17:00hrs on the 10 December 2026.&nbsp;\u003C\u002Fp>\n\u003Cp>\u003Ca href=\"https:\u002F\u002Feu.simplystakeholders.com\u002Fen-AU\u002Fnew-ui\u002Fform-response\u002Fresponse?token=eyJhbGciOiJIUzI1NiIsImtpZCI6InNzdGstZm9ybS1yZXNwb25zZS1ldSIsInR5cCI6IkpXVCJ9.eyJhdWQiOiJzc3RrLWZvcm0tcmVzcG9uc2UtZXUiLCJpc3MiOiJodHRwczovL3Rlc3QuZGFyemluLmNvbSIsImlhdCI6MTc5MzExNzczNSwiRG9tYWluSUQiOiIxMDU1IiwiRm9ybUlEIjoiNDgiLCJVc2VySUQiOiIyNzUzNiIsIlByb2plY3RJRHMiOiI0NjY2IiwicHJvcHMiOiJ7XCIuaXNzdWVkXCI6XCJUdWUsIDI3IE9jdCAyMDI2IDE2OjE1OjM1IEdNVFwifSIsImV4cCI6MTc5MzEyMTMzNSwibmJmIjoxNzkzMTE3NzM1fQ.W5YECswST5_x0fOEDsFWs-3uEdIiGrddxI29qfTO5Ms\" data-new-window=\"true\" title=\"Response form \" target=\"_blank\" rel=\"noopener noreferrer\">\u003Cstrong>Make a Submission\u003C\u002Fstrong>\u003C\u002Fa>\u003Cstrong>.\u003C\u002Fstrong>&nbsp;\u003C\u002Fp>\n\u003Cp>\u003Cstrong>Public Consultation Events\u003C\u002Fstrong>&nbsp;\u003C\u002Fp>\n\u003Cp>Meet the project team to learn more about the Preferred Route and ask questions.&nbsp;\u003C\u002Fp>\n\u003Ctable>\u003Ctbody>\n  \u003Ctr>\u003Ctd>\u003Cstrong>Location\u003C\u002Fstrong>&nbsp;\u003C\u002Ftd>\u003Ctd>\u003Cstrong>Date\u003C\u002Fstrong>&nbsp;\u003C\u002Ftd>\u003Ctd>\u003Cstrong>Time\u003C\u002Fstrong>&nbsp;\u003C\u002Ftd>\u003C\u002Ftr>\n  \u003Ctr>\u003Ctd>\u003Cstrong>Navan\u003C\u002Fstrong> – Solstice Arts Centre (C15KWP1)&nbsp;\u003C\u002Ftd>\u003Ctd>18 November 2026&nbsp;\u003C\u002Ftd>\u003Ctd>16:00hrs–20:00hrs&nbsp;\u003C\u002Ftd>\u003C\u002Ftr>\n  \u003Ctr>\u003Ctd>\u003Cstrong>Kilmessan\u003C\u002Fstrong> – Station House Hotel (C15N40D)&nbsp;\u003C\u002Ftd>\u003Ctd>24 November 2026&nbsp;\u003C\u002Ftd>\u003Ctd>16:00hrs–20:00hrs&nbsp;\u003C\u002Ftd>\u003C\u002Ftr>\n  \u003Ctr>\u003Ctd>\u003Cstrong>Dunshaughlin\u003C\u002Fstrong> – Pastoral Centre (A85W886)&nbsp;\u003C\u002Ftd>\u003Ctd>03 December 2026&nbsp;\u003C\u002Ftd>\u003Ctd>15:00hrs–20:00hrs&nbsp;\u003C\u002Ftd>\u003C\u002Ftr>\n  \u003Ctr>\u003Ctd>\u003Cstrong>Online Webinar\u003C\u002Fstrong>&nbsp;\u003C\u002Ftd>\u003Ctd>01 December\u003C\u002Ftd>\u003Ctd>19:00hrs&nbsp;\u003C\u002Ftd>\u003C\u002Ftr>\n\u003C\u002Ftbody>\u003C\u002Ftable>\n\u003Cp>\u003Ca href=\"https:\u002F\u002Feu.simplystakeholders.com\u002Fnew-ui\u002Fform-response\u002Fresponse?token=eyJhbGciOiJIUzI1NiIsImtpZCI6InNzdGstZm9ybS1yZXNwb25zZS1ldSIsInR5cCI6IkpXVCJ9.eyJhdWQiOiJzc3RrLWZvcm0tcmVzcG9uc2UtZXUiLCJpc3MiOiJodHRwczovL3Rlc3QuZGFyemluLmNvbSIsImlhdCI6MTc5NDIzMzE1MywiRG9tYWluSUQiOiIxMDU1IiwiRm9ybUlEIjoiNTAiLCJVc2VySUQiOiIyNjYyNCIsIlByb2plY3RJRHMiOiI0NjY2IiwicHJvcHMiOiJ7XCIuaXNzdWVkXCI6XCJNb24sIDA5IE5vdiAyMDI2IDE0OjA1OjUzIEdNVFwifSIsImV4cCI6MTc5NDIzNjc1MywibmJmIjoxNzk0MjMzMTUzfQ.hTvCkDyCSbpUc7zQA3-YRXh6sr2_fN8yiCgL04t1yoA\" data-new-window=\"true\" title=\"Register for the Online Webinar\" target=\"_blank\" rel=\"noopener noreferrer\">&nbsp;Register for the Online Webinar\u003C\u002Fa>\u003C\u002Fp>\n\u003Ch3>How To Engage&nbsp;&nbsp;\u003C\u002Fh3>\n\u003Cp>The project team is available to answer any queries you may have on Navan Railway. To get in touch, or make a submission to the consultation, you can:&nbsp;&nbsp;\u003C\u002Fp>\n\u003Cul>\n  \u003Cli>Email us at \u003Ca href=\"mailto:navan@irishrail.ie\">navan@irishrail.ie\u003C\u002Fa>&nbsp;\u003C\u002Fli>\n  \u003Cli>Phone us on&nbsp;\u003Ca data-phone-number=\"017034451&nbsp;\" href=\"tel:017034451&nbsp;\">(01) 703 4451&nbsp;\u003C\u002Fa>\u003C\u002Fli>\n  \u003Cli>Write to Navan Railway Project, Iarnród Éireann, Haymarket House, Smithfield, Dublin 7, D07 CF98&nbsp;&nbsp;\u003C\u002Fli>\n  \u003Cli>\u003Ca href=\"https:\u002F\u002Feu.simplystakeholders.com\u002Fen-AU\u002Fnew-ui\u002Fform-response\u002Fresponse?token=eyJhbGciOiJIUzI1NiIsImtpZCI6InNzdGstZm9ybS1yZXNwb25zZS1ldSIsInR5cCI6IkpXVCJ9.eyJhdWQiOiJzc3RrLWZvcm0tcmVzcG9uc2UtZXUiLCJpc3MiOiJodHRwczovL3Rlc3QuZGFyemluLmNvbSIsImlhdCI6MTc5MzExNzczNSwiRG9tYWluSUQiOiIxMDU1IiwiRm9ybUlEIjoiNDgiLCJVc2VySUQiOiIyNzUzNiIsIlByb2plY3RJRHMiOiI0NjY2IiwicHJvcHMiOiJ7XCIuaXNzdWVkXCI6XCJUdWUsIDI3IE9jdCAyMDI2IDE2OjE1OjM1IEdNVFwifSIsImV4cCI6MTc5MzEyMTMzNSwibmJmIjoxNzkzMTE3NzM1fQ.W5YECswST5_x0fOEDsFWs-3uEdIiGrddxI29qfTO5Ms\" data-new-window=\"true\" title=\"Web form \" target=\"_blank\" rel=\"noopener noreferrer\">Click here to complete the online consultation response form &nbsp;\u003C\u002Fa>\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cp>\u003Cem>This link will take you to a new website (eu.simplystakeholder.com) to complete the response form\u003C\u002Fem>&nbsp;\u003C\u002Fp>\n\u003Cul>\n  \u003Cli>Come along to one of the consultation events&nbsp;\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Ch3>Next Steps&nbsp;\u003C\u002Fh3>\n\u003Cul>\n  \u003Cli>All feedback submitted during this public consultation will be carefully reviewed by the project team and will help inform the next stage of the project.&nbsp;&nbsp;\u003C\u002Fli>\n  \u003Cli>Environmental assessments will be undertaken on interventions along the entire route&nbsp;\u003C\u002Fli>\n  \u003Cli>Engagement with property owners and other stakeholders will continue throughout the duration of the project.&nbsp;&nbsp;\u003C\u002Fli>\n  \u003Cli>Following consideration of the feedback received and further development of design proposals, a Railway Order application (similar to a planning application) will be prepared and lodged with An Coimisiún Pleanála (ACP).&nbsp;&nbsp;\u003C\u002Fli>\n  \u003Cli>Following lodgement of the Railway Order application, ACP will run a statutory consultation where additional feedback can be submitted to the Coimisiún.&nbsp;\u003C\u002Fli>\n\u003C\u002Ful>\n\u003Cfigure data-asset-id=\"7651e6f1-6aa7-42ba-b41a-0adcac9a312f\" data-image-id=\"7651e6f1-6aa7-42ba-b41a-0adcac9a312f\">\u003Cimg src=\"/_kontent/d2e85689-fbf9-010a-a02e-587ed94b5032/0dcb0065-4855-46cb-a9a5-d1d1a0ceee60/IE000931_Navan%20Railway%20Timeline%20English.png\" data-asset-id=\"7651e6f1-6aa7-42ba-b41a-0adcac9a312f\" data-image-id=\"7651e6f1-6aa7-42ba-b41a-0adcac9a312f\" alt=\"Navan Railway Timeline info graphic -  English.\">\u003C\u002Ffigure>\n\u003Cp>Steps to deliver the Navan Railway project&nbsp;\u003C\u002Fp>\n\u003Ch2>Frequently Asked Questions\u003C\u002Fh2>",{"items":1347},[],{"items":1349},[],{"__typename":1351,"_system_":1352,"subtitle":14,"title":1179,"listType":1355,"items":1361},"List",{"codename":1353,"id":1354,"name":1354},"d2573ad8_1e90_0198_2213_f5f3dbeaff2d","d2573ad8-1e90-0198-2213-f5f3dbeaff2d",{"items":1356},[1357],{"_system_":1358},{"codename":1359,"name":1360},"accordion","Accordion",{"items":1362,"totalCount":1377},[1363,1370],{"__typename":1360,"_system_":1364,"header":1367,"content":1368},{"codename":1365,"id":1366},"how_was_feedback_from_the_first_consultation_consi_c1c6dea","c1c6dea7-0ea5-4cbf-98f7-a9b2c7d797ce","How was feedback from the first consultation considered? ",{"html":1369},"\u003Cp>All submissions received during the Emerging Preferred Route consultation were carefully reviewed. Key concerns raised in the submissions were identified and addressed by the project team. &nbsp;\u003Cbr>\n\u003Cbr>\nThe consultation feedback informed a programme of further engineering, transport, environmental and technical assessments. This work helped identify opportunities to refine the proposed route, respond to feedback raised during consultation and support the selection of a Preferred Route for Navan Railway. \u003Cbr>\n\u003Cbr>\nThe consultation findings will continue to inform the project’s development during the preliminary design and the environmental assessments phase, along with feedback received as part of this second consultation.\u003C\u002Fp>",{"__typename":1360,"_system_":1371,"header":1374,"content":1375},{"codename":1372,"id":1373},"what_has_changed_since_the_emerging_preferred_rout","9cd29878-2ea0-42c1-ab9a-4f2a912f502e","What has changed since the Emerging Preferred Route consultation?  ",{"html":1376},"\u003Cp>Feedback provided by communities, landowners, stakeholders and members of the public informed a programme of further analysis and technical studies. This work sought to better understand the opportunities, constraints and local issues identified during consultation and support the selection of a Preferred Route for Navan Railway. &nbsp;\u003Cbr>\n\u003Cbr>\nFurther details on the assessments carried out, their outcomes and the proposed changes are included in the Technical Review of Feedback on the Emerging Preferred Route report.&nbsp;\u003C\u002Fp>",2,{"__typename":1351,"_system_":1379,"subtitle":14,"title":1382,"listType":1383,"items":1387},{"codename":1380,"id":1381,"name":1381},"n542f1546_e834_0151_5059_b20405669fa3","542f1546-e834-0151-5059-b20405669fa3","Route, Stations and Access ",{"items":1384},[1385],{"_system_":1386},{"codename":1359,"name":1360},{"items":1388,"totalCount":1431},[1389,1396,1403,1410,1417,1424],{"__typename":1360,"_system_":1390,"header":1393,"content":1394},{"codename":1391,"id":1392},"how_many_new_stations_are_proposed_and_where_are_t_e2f5d3d","e2f5d3d5-dd0b-4829-8057-eaac3036e98d","How many new stations are proposed and where are they located? ",{"html":1395},"\u003Cp>Four new stations are proposed as part of the Preferred Route: Navan North, Navan Central, Kilmessan and Dunshaughlin. \u003Cbr>\n\u003Cbr>\nThe current proposals identify the following locations:&nbsp;\u003C\u002Fp>\n\u003Cul>\n  \u003Cli>Navan North: Off Ratholdren Road, along the disused Kingscourt railway line&nbsp;\u003C\u002Fli>\n  \u003Cli>Navan Central: Between Carriage Road and Trim Road (R161)&nbsp;\u003C\u002Fli>\n  \u003Cli>Kilmessan: On a greenfield site west of the village, accessed from the L2205&nbsp;\u003C\u002Fli>\n  \u003Cli>Dunshaughlin: On a greenfield site to the west of the town, accessed from Main Street and the M3 Junction 6 Service Station roundabout.&nbsp;\u003C\u002Fli>\n\u003C\u002Ful>",{"__typename":1360,"_system_":1397,"header":1400,"content":1401},{"codename":1398,"id":1399},"will_the_navan_railway_be_electrified_","8ca32962-1615-4a42-a02b-6a8df9438dce","Will the Navan Railway be electrified? ",{"html":1402},"\u003Cp>Yes. Navan Railway will be an extension of the planned DART+ West line from M3 Parkway.&nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1404,"header":1407,"content":1408},{"codename":1405,"id":1406},"what_does_electrification_mean__what_equipment_is__472dec1","472dec1a-04a6-4e0b-a07f-969eb709e027","What does electrification mean? What equipment is required to electrify a railway? ",{"html":1409},"\u003Cp>An electrified railway means that the trains on that line are powered by electricity rather than diesel or other fossil fuels. Electrified railways typically require Overhead Line Equipment (OHLE) and electrical substations to be installed (similar to the current DART network in Dublin).&nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1411,"header":1414,"content":1415},{"codename":1412,"id":1413},"what_facilities_are_proposed_at_the_stations__b8d8235","b8d8235b-97a5-46e7-bc64-e20cd7d51b3a","What facilities are proposed at the stations? ",{"html":1416},"\u003Cp>The design of the four new stations will continue throughout the next stage of the project’s development. The stations will be designed to meet modern standards and to be integrated with other modes of travel including buses, walking and cycling.&nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1418,"header":1421,"content":1422},{"codename":1419,"id":1420},"will_the_stations_be_accessible__f72f1c9","f72f1c9f-0eba-4950-8ca1-48a6f0ddb020","Will the stations be accessible? ",{"html":1423},"\u003Cp>Accessibility has been a key consideration. The stations will be designed to meet modern accessibility standards and relevant best practice.&nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1425,"header":1428,"content":1429},{"codename":1426,"id":1427},"will_there_be_car_parking_at_the_stations__978de6a","978de6ab-e206-4225-bfdc-bf3553f1f60e","Will there be car parking at the stations? ",{"html":1430},"\u003Cp>Yes. Large Park &amp; Ride facilities are proposed at Navan North, Kilmessan and Dunshaughlin. Parking at Navan Central is expected to be more limited because of its urban location.&nbsp;\u003C\u002Fp>",6,{"__typename":1351,"_system_":1433,"subtitle":14,"title":1436,"listType":1437,"items":1441},{"codename":1434,"id":1435,"name":1435},"n401a0e3b_1825_0180_24ea_a00b6e455a06","401a0e3b-1825-0180-24ea-a00b6e455a06","Property and Land Impacts ",{"items":1438},[1439],{"_system_":1440},{"codename":1359,"name":1360},{"items":1442,"totalCount":1478},[1443,1450,1457,1464,1471],{"__typename":1360,"_system_":1444,"header":1447,"content":1448},{"codename":1445,"id":1446},"will_land_or_property_need_to_be_acquired_for_the__af7117f","af7117f1-e9e4-43cd-95c8-e4263ba54730","Will land or property need to be acquired for the project? ",{"html":1449},"\u003Cp>Yes. When the Navan Railway was closed in the 1960s, the infrastructure was dismantled and the lands were sold. &nbsp;\u003Cbr>\n\u003Cbr>\nShould the project receive planning approval through the Railway Order process, the project will also be granted Compulsory Purchase powers to begin acquiring the land and property needed to complete the project. At this stage IÉ have identified a corridor within which the proposed railway, stations, car parks and other infrastructure may be located. This corridor is wider than what the final railway will be. The exact land take has not yet been confirmed. Every effort will be made to minimise impacts on surrounding lands and consultation with impacted and potentially impacted landowners will continue through the project’s development. &nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1451,"header":1454,"content":1455},{"codename":1452,"id":1453},"i_received_a_letter_that_my_land_may_be_impacted___50a9c18","50a9c185-0719-4aac-8438-08eef0773fe1","I received a letter that my land may be impacted. What does this mean? ",{"html":1456},"\u003Cp>If you received a letter from the project team stating that your property may be affected by the Preferred Route, this means that your property falls within the corridor where the proposed railway, stations or other infrastructure (temporary or permanent) may be located.&nbsp;&nbsp;\u003C\u002Fp>\n\u003Cp>Every effort will be made to minimise impacts on surrounding lands and consultation with impacted and potentially impacted landowners will continue through the project’s development.&nbsp;\u003C\u002Fp>\n\u003Cp>You can contact project team on (01) 703 4451 or at \u003Ca href=\"mailto:navan@irishrail.ie\">navan@irishrail.ie\u003C\u002Fa> to discuss the potential impacts on your property.&nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1458,"header":1461,"content":1462},{"codename":1459,"id":1460},"will_access_to_private_land_be_required_during_pro_9731d32","9731d32e-3636-41b1-8939-d8afbdc22c96","Will access to private land be required during project development? ",{"html":1463},"\u003Cp>Iarnród Éireann may need access to private land for activities such as surveys or investigations. Where access is required, IÉ will contact the landowner or occupier in advance to seek permission. \u003Cbr>\n\u003Cbr>\nAny land that is required to be accessed in the construction or operational phases of Navan Railway will be identified in the Railway Order application for An Coimisiún Pleanála’s approval.&nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1465,"header":1468,"content":1469},{"codename":1466,"id":1467},"will_people_living_near_the_proposed_route_be_affe_ea7403f","ea7403f9-b503-4ee1-8263-daffee89485b","Will people living near the proposed route be affected? ",{"html":1470},"\u003Cp>As with any infrastructure project, there may be some local impacts during construction and operation. The project’s design will make every effort to ensure that impacts are avoided, reduced or mitigated as far as practicable The next stage of the project will include environmental assessments of the entire route which will consider any likely impacts on people living near the route and where required propose design changes or mitigation measures.&nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1472,"header":1475,"content":1476},{"codename":1473,"id":1474},"how_do_i_know_if_my_property_is_potentially_affect_6abaf91","6abaf915-fa5b-4485-9b89-393147bc5845","How do I know if my property is potentially affected by land acquisition? ",{"html":1477},"\u003Cp>If you received a letter from the project team, your property is within the Preferred Route corridor and may potentially be affected. If you did not receive a letter but think you may be impacted, you can contact project team on (01) 703 4451 or at \u003Ca href=\"mailto:navan@irishrail.ie\">navan@irishrail.ie\u003C\u002Fa> to discuss the potential impacts at your property.&nbsp;\u003C\u002Fp>",5,{"__typename":1351,"_system_":1480,"subtitle":14,"title":1483,"listType":1484,"items":1488},{"codename":1481,"id":1482,"name":1482},"n2f1466d0_0457_0101_95e2_5757b0e56892","2f1466d0-0457-0101-95e2-5757b0e56892","Consultation and Engagement ",{"items":1485},[1486],{"_system_":1487},{"codename":1359,"name":1360},{"items":1489,"totalCount":1478},[1490,1497,1504,1511,1518],{"__typename":1360,"_system_":1491,"header":1494,"content":1495},{"codename":1492,"id":1493},"how_can_a_submission_be_made__8963c59","8963c593-b187-4947-b9e5-d9a582533ffd","How can a submission be made? ",{"html":1496},"\u003Cp>Submissions can be made online through the \u003Ca href=\"https:\u002F\u002Feu.simplystakeholders.com\u002Fen-AU\u002Fnew-ui\u002Fform-response\u002Fresponse?token=eyJhbGciOiJIUzI1NiIsImtpZCI6InNzdGstZm9ybS1yZXNwb25zZS1ldSIsInR5cCI6IkpXVCJ9.eyJhdWQiOiJzc3RrLWZvcm0tcmVzcG9uc2UtZXUiLCJpc3MiOiJodHRwczovL3Rlc3QuZGFyemluLmNvbSIsImlhdCI6MTc5MzExNzczNSwiRG9tYWluSUQiOiIxMDU1IiwiRm9ybUlEIjoiNDgiLCJVc2VySUQiOiIyNzUzNiIsIlByb2plY3RJRHMiOiI0NjY2IiwicHJvcHMiOiJ7XCIuaXNzdWVkXCI6XCJUdWUsIDI3IE9jdCAyMDI2IDE2OjE1OjM1IEdNVFwifSIsImV4cCI6MTc5MzEyMTMzNSwibmJmIjoxNzkzMTE3NzM1fQ.W5YECswST5_x0fOEDsFWs-3uEdIiGrddxI29qfTO5Ms\" data-new-window=\"true\" title=\"Feedback Form \" target=\"_blank\" rel=\"noopener noreferrer\">project response form\u003C\u002Fa>. You can also contact the project team by email, phone or post.&nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1498,"header":1501,"content":1502},{"codename":1499,"id":1500},"how_can_i_receive_updates_on_the_project__0ddecc8","0ddecc8b-dbe4-46a8-b0a2-ae5803ba84bd","How can I receive updates on the project?  ",{"html":1503},"\u003Cp>The project webpage will be updated as Navan Railway project progresses.  &nbsp;\u003C\u002Fp>\n\u003Cp>You can also request to be added to project email list to receive updates by:  &nbsp;\u003C\u002Fp>\n\u003Col>\n  \u003Cli>Completing the \u003Ca href=\"https:\u002F\u002Feu.simplystakeholders.com\u002Fen-AU\u002Fnew-ui\u002Fform-response\u002Fresponse?token=eyJhbGciOiJIUzI1NiIsImtpZCI6InNzdGstZm9ybS1yZXNwb25zZS1ldSIsInR5cCI6IkpXVCJ9.eyJhdWQiOiJzc3RrLWZvcm0tcmVzcG9uc2UtZXUiLCJpc3MiOiJodHRwczovL3Rlc3QuZGFyemluLmNvbSIsImlhdCI6MTc5MzExNzczNSwiRG9tYWluSUQiOiIxMDU1IiwiRm9ybUlEIjoiNDgiLCJVc2VySUQiOiIyNzUzNiIsIlByb2plY3RJRHMiOiI0NjY2IiwicHJvcHMiOiJ7XCIuaXNzdWVkXCI6XCJUdWUsIDI3IE9jdCAyMDI2IDE2OjE1OjM1IEdNVFwifSIsImV4cCI6MTc5MzEyMTMzNSwibmJmIjoxNzkzMTE3NzM1fQ.W5YECswST5_x0fOEDsFWs-3uEdIiGrddxI29qfTO5Ms\" data-new-window=\"true\" title=\"Online Feedback form\" target=\"_blank\" rel=\"noopener noreferrer\">online consultation response form \u003C\u002Fa>\u003C\u002Fli>\n\u003C\u002Fol>\n\u003Cp>This link will take you to a new website (eu.simplystakeholder.com) to complete the response form&nbsp;\u003C\u002Fp>\n\u003Cp>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;2. Contacting the project team by phone or email &nbsp;\u003C\u002Fp>\n\u003Cp>Iarnród Éireann will keep all stakeholders updated and informed as the project advances through the phases of development. &nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1505,"header":1508,"content":1509},{"codename":1506,"id":1507},"will_there_be_opportunities_to_meet_the_project_te_4a50130","4a501302-a44a-4225-af53-263e633e5a8b","Will there be opportunities to meet the project team? ",{"html":1510},"\u003Cp>Yes. The project team will be available to discuss the project at the public information events:&nbsp;\u003C\u002Fp>\n\u003Cp>• \u003Cstrong>Navan Solstice Arts Centre (C15 KWP1) 18th November 2026\u003C\u002Fstrong>, 16:00hrs – 20:00hrs&nbsp;\u003C\u002Fp>\n\u003Cp>•\u003Cstrong> Dunshaughlin Pastoral Centre (A85 W886) 24th November 2026\u003C\u002Fstrong>, 16:00hrs – 20:00hrs&nbsp;\u003C\u002Fp>\n\u003Cp>• \u003Cstrong>Station House Hotel, Kilmessan (C15 N40D) 3rd November 2026\u003C\u002Fstrong>, 16:00hrs – 20:00hrs&nbsp;\u003C\u002Fp>\n\u003Cp>• \u003Cstrong>Online Public Webinar - please \u003C\u002Fstrong>\u003Ca href=\"https:\u002F\u002Feu.simplystakeholders.com\u002Fen-AU\u002Fnew-ui\u002Fform-response\u002Fresponse?token=eyJhbGciOiJIUzI1NiIsImtpZCI6InNzdGstZm9ybS1yZXNwb25zZS1ldSIsInR5cCI6IkpXVCJ9.eyJhdWQiOiJzc3RrLWZvcm0tcmVzcG9uc2UtZXUiLCJpc3MiOiJodHRwczovL3Rlc3QuZGFyemluLmNvbSIsImlhdCI6MTc5NDIzMzE1MywiRG9tYWluSUQiOiIxMDU1IiwiRm9ybUlEIjoiNTAiLCJVc2VySUQiOiIyNjYyNCIsIlByb2plY3RJRHMiOiI0NjY2IiwicHJvcHMiOiJ7XCIuaXNzdWVkXCI6XCJNb24sIDA5IE5vdiAyMDI2IDE0OjA1OjUzIEdNVFwifSIsImV4cCI6MTc5NDIzNjc1MywibmJmIjoxNzk0MjMzMTUzfQ.hTvCkDyCSbpUc7zQA3-YRXh6sr2_fN8yiCgL04t1yoA\" data-new-window=\"true\" target=\"_blank\" rel=\"noopener noreferrer\">\u003Cstrong>register here\u003C\u002Fstrong>\u003C\u002Fa>\u003Cstrong> 1st December 2026\u003C\u002Fstrong>, 19:00hrs – 20:00hrs&nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1512,"header":1515,"content":1516},{"codename":1513,"id":1514},"how_will_feedback_be_used__5312f84","5312f84a-f37b-4a5f-9a08-e2c027d2e769","How will feedback be used? ",{"html":1517},"\u003Cp>All submissions received during the consultation period will be reviewed by the project team. The feedback will help refine the route, inform design development and support environmental assessment work as the project progresses to its next stages. \u003Cbr>\n\u003Cbr>\nA report will be published summarising the feedback received and detailing how it informed the design development.&nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1519,"header":1522,"content":1523},{"codename":1520,"id":1521},"will_there_be_more_consultations__95cf9a9","95cf9a92-6386-4537-b8cd-1be2dc48eb8b","Will there be more consultations? ",{"html":1524},"\u003Cp>Engagement with communities, stakeholders and property owners will continue as the project progresses through preliminary design and environmental assessment.&nbsp;\u003C\u002Fp>\n\u003Cp>Following consideration of the feedback received during consultation and further development of design proposals, a Railway Order application (similar to a planning application) will be prepared and lodged with An Coimisiún Pleanála (ACP).&nbsp;&nbsp;\u003C\u002Fp>\n\u003Cp>Following lodgement of the Railway Order application, ACP will run a statutory consultation where additional feedback can be submitted to the Coimisiún.&nbsp;\u003C\u002Fp>",{"__typename":1351,"_system_":1526,"subtitle":14,"title":1529,"listType":1530,"items":1534},{"codename":1527,"id":1528,"name":1528},"ec305693_2349_012e_fcd6_894ad488007f","ec305693-2349-012e-fcd6-894ad488007f","Planning, Environment & Next Steps ",{"items":1531},[1532],{"_system_":1533},{"codename":1359,"name":1360},{"items":1535,"totalCount":1431},[1536,1543,1550,1557,1564,1571],{"__typename":1360,"_system_":1537,"header":1540,"content":1541},{"codename":1538,"id":1539},"will_this_project_require_planning_permission__80b910f","80b910f1-0f2f-4579-aa9f-4433b634a847","Will this project require planning permission? ",{"html":1542},"\u003Cp>Yes, Navan Railway will require planning permission to proceed to construction. A Railway Order application (similar to a planning application) will be submitted to An Coimisiún Pleanála to make a decision on the project. &nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1544,"header":1547,"content":1548},{"codename":1545,"id":1546},"what_is_a_railway_order__3785746","37857464-982f-47a3-9ad2-0ac1e70b4646","What is a Railway Order? ",{"html":1549},"\u003Cp>A Railway Order is the statutory planning process for railway infrastructure projects of this type and is broadly similar to the planning process for strategic infrastructure. The Railway Order application process is set out in the Transport (Railway Infrastructure) Act 2001 as amended by the Strategic Infrastructure Act 2006.&nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1551,"header":1554,"content":1555},{"codename":1552,"id":1553},"is_the_project_supported_by_policy__08fe87f","08fe87fd-b2f0-469e-bc20-057defe0599b","Is the project supported by policy? ",{"html":1556},"\u003Cp>Yes. The project is strongly supported by national, regional and local policy objectives, including public transport decarbonisation, regional connectivity, compact growth and the Greater Dublin Area transport strategy.&nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1558,"header":1561,"content":1562},{"codename":1559,"id":1560},"what_documents_are_expected_as_part_of_the_plannin_d21f3ff","d21f3ff4-76a9-47cc-b38d-2852fff0aca7","What documents are expected as part of the planning application? ",{"html":1563},"\u003Cp>The Railway Order application is expected to include technical documents, drawings and an Environmental Impact Assessment Report. Together, these documents would describe the project, identify likely impacts and set out proposed mitigation where required.&nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1565,"header":1568,"content":1569},{"codename":1566,"id":1567},"will_the_project_have_any_environmental_impacts__cfed9b3","cfed9b37-d2aa-47ae-bf20-7bd41fc59ae0","Will the project have any environmental impacts? ",{"html":1570},"\u003Cp>As with any major infrastructure project, Navan Railway will bring both temporary and permanent impacts to the environment and local communities. The project’s design will make every effort to ensure that negative impacts are avoided, reduced or mitigated as far as practicable and that positive effects are maximised.  &nbsp;\u003C\u002Fp>\n\u003Cp>An Environmental Impact Assessment Report (EIAR) will be submitted as part of the Railway Order application for Navan Railway. The EIAR will consider the likely effects on the local environment and where necessary, identify measures to mitigate any potential adverse effects. &nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1572,"header":1575,"content":1576},{"codename":1573,"id":1574},"is_funding_already_in_place_for_navan_railway__afe3e80","afe3e80d-5a2d-46b3-97a6-688e58d0e19f","Is funding already in place for Navan Railway? ",{"html":1577},"\u003Cp>Navan Railway is subject to funding and will need to secure the necessary approvals and funding as it progresses through the stages of development.&nbsp;\u003C\u002Fp>",7,"\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"a6176875_604f_0136_e5bc_6d687ec9c1a7\">\u003C\u002Fobject>\n\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"link\" data-codename=\"useful_downloads_and_links_navan_nspc2\">\u003C\u002Fobject>\n\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n83b1205e_9d64_01b2_eb96_14a4239ccfd6\">\u003C\u002Fobject>\n\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"link\" data-codename=\"project_overview___navan_nspc2\">\u003C\u002Fobject>\n\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"d2573ad8_1e90_0198_2213_f5f3dbeaff2d\">\u003C\u002Fobject>\n\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n542f1546_e834_0151_5059_b20405669fa3\">\u003C\u002Fobject>\n\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n401a0e3b_1825_0180_24ea_a00b6e455a06\">\u003C\u002Fobject>\n\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"n2f1466d0_0457_0101_95e2_5757b0e56892\">\u003C\u002Fobject>\n\u003Cobject type=\"application\u002Fkenticocloud\" data-type=\"item\" data-rel=\"component\" data-codename=\"ec305693_2349_012e_fcd6_894ad488007f\">\u003C\u002Fobject>",{"items":1581},[1582,1623],{"__typename":1351,"_system_":1583,"subtitle":14,"title":1587,"listType":1588,"items":1592},{"codename":1584,"id":1585,"name":1586},"useful_downloads_and_links_navan_nspc2","aba2d056-0240-4e35-a3eb-291d49f3f69f","Useful Downloads and Links Navan NSPC2","Useful Downloads and Links",{"items":1589},[1590],{"_system_":1591},{"codename":1359,"name":1360},{"items":1593,"totalCount":1622},[1594,1601,1608,1615],{"__typename":1360,"_system_":1595,"header":1598,"content":1599},{"codename":1596,"id":1597},"public_consultation_999ae0a","999ae0a5-f54e-4f12-8567-93805d82a309","Public Consultation Material",{"html":1600},"\u003Cp>\u003Ca data-asset-id=\"96975379-df28-4c7b-9397-024d5f87b30d\" href=\"/_kontent/d2e85689-fbf9-010a-a02e-587ed94b5032/04f6c4f0-d516-48ce-beed-4b8770916e00/NR_NSPC2_Leaflet.pdf\">Public Consultation 2 Leaflet &nbsp;\u003C\u002Fa>\u003Cbr>\n\u003Cbr>\n\u003Ca data-asset-id=\"cc9d69e0-d35d-492c-aa59-6814d97c8191\" href=\"/_kontent/d2e85689-fbf9-010a-a02e-587ed94b5032/baa5db9a-6f8c-4dd3-b915-46bf6010065e/NR_NSPC2_Brochure_Eng.pdf\">Public Consultation 2 Brochure &nbsp;\u003C\u002Fa>\u003Cbr>\n\u003Cbr>\n\u003Ca data-asset-id=\"cf166357-0209-48dd-8e0c-2cf0ff431f37\" href=\"/_kontent/d2e85689-fbf9-010a-a02e-587ed94b5032/3b0813c0-863d-4694-bc90-d9e5c71556c9/NR_NSPC2_Brochure_Irish.pdf\">Public Consultation 2 Brochure - As Gaeilge&nbsp;\u003C\u002Fa>\u003C\u002Fp>",{"__typename":1360,"_system_":1602,"header":1605,"content":1606},{"codename":1603,"id":1604},"public_consultation_response_form_5a9321a","5a9321ad-c76a-41e3-938f-4964bf2cc358","Public Consultation Response Form  ",{"html":1607},"\u003Cp>\u003Ca href=\"https:\u002F\u002Feu.simplystakeholders.com\u002Fen-AU\u002Fnew-ui\u002Fform-response\u002Fresponse?token=eyJhbGciOiJIUzI1NiIsImtpZCI6InNzdGstZm9ybS1yZXNwb25zZS1ldSIsInR5cCI6IkpXVCJ9.eyJhdWQiOiJzc3RrLWZvcm0tcmVzcG9uc2UtZXUiLCJpc3MiOiJodHRwczovL3Rlc3QuZGFyemluLmNvbSIsImlhdCI6MTc5MzExNzczNSwiRG9tYWluSUQiOiIxMDU1IiwiRm9ybUlEIjoiNDgiLCJVc2VySUQiOiIyNzUzNiIsIlByb2plY3RJRHMiOiI0NjY2IiwicHJvcHMiOiJ7XCIuaXNzdWVkXCI6XCJUdWUsIDI3IE9jdCAyMDI2IDE2OjE1OjM1IEdNVFwifSIsImV4cCI6MTc5MzEyMTMzNSwibmJmIjoxNzkzMTE3NzM1fQ.W5YECswST5_x0fOEDsFWs-3uEdIiGrddxI29qfTO5Ms\" data-new-window=\"true\" title=\"Consultation response form online&nbsp;\" target=\"_blank\" rel=\"noopener noreferrer\">Click here to complete the consultation response form online&nbsp;\u003C\u002Fa>\u003C\u002Fp>\n\u003Cp>\u003Ca data-asset-id=\"4f611b74-c483-424c-a19b-7aa7c325cd76\" href=\"/_kontent/d2e85689-fbf9-010a-a02e-587ed94b5032/a931a63b-27d0-4683-a716-2f120b4960aa/NR_NSPC2_Feedback%20form_Eng.pdf\">Download the consultation response form&nbsp;\u003C\u002Fa>\u003C\u002Fp>",{"__typename":1360,"_system_":1609,"header":1612,"content":1613},{"codename":1610,"id":1611},"preferred_route","70c22fb4-6b07-428f-bc37-60e928eaf3c5","Preferred Route  ",{"html":1614},"\u003Cp>\u003Ca data-asset-id=\"0ed5a435-5979-4b0c-949d-14513887c832\" href=\"/_kontent/d2e85689-fbf9-010a-a02e-587ed94b5032/65df8abb-aace-4e4e-afcd-94bfc2af34b4/C789-P02-CON-X-XXX-DR-TTI-X-000003%20P01_A_C01%20%281%29.pdf\">Preferred Route Consultation Drawings \u003C\u002Fa>&nbsp;\u003Cbr>\n\u003Cbr>\n\u003Ca href=\"https:\u002F\u002Fexperience.arcgis.com\u002Fexperience\u002Fc100ea5b7a134f31814c2cc871abf894\" data-new-window=\"true\" target=\"_blank\" rel=\"noopener noreferrer\">Interactive map of the Preferred Route corridor&nbsp;\u003C\u002Fa>\u003C\u002Fp>",{"__typename":1360,"_system_":1616,"header":1619,"content":1620},{"codename":1617,"id":1618},"reports","f86fd941-dddc-4f18-9356-fff196cbeb27","Reports",{"html":1621},"\u003Cp>\u003Ca data-asset-id=\"de00f418-35ec-4094-8993-e5262d58d07b\" href=\"/_kontent/d2e85689-fbf9-010a-a02e-587ed94b5032/3565a939-2fc7-43be-bfc8-b9dadf5447ce/IE000931_NR_NSPC1%20Consultation%20Report_C01.01.pdf\">Non-Statutory Public Consultation No. 1 – Consultation Findings Report &nbsp;\u003C\u002Fa>\u003Cbr>\n\u003Cbr>\n\u003Ca data-asset-id=\"dcddb036-caaa-436b-884b-def313d91215\" href=\"/_kontent/d2e85689-fbf9-010a-a02e-587ed94b5032/ad9ebb03-fffa-45a3-9712-188b728468e9/Navan%20Line%20-%20Technical%20Review%20of%20Feedback%20on%20EPR%20C01.pdf\">Technical Review of Feedback on the Emerging Preferred Route&nbsp;\u003C\u002Fa>\u003C\u002Fp>",4,{"__typename":1351,"_system_":1624,"subtitle":14,"title":1628,"listType":1629,"items":1633},{"codename":1625,"id":1626,"name":1627},"project_overview___navan_nspc2","b39bed72-32ef-42cd-b79a-89750edcaf72","Project Overview - Navan NSPC2","Project Overview",{"items":1630},[1631],{"_system_":1632},{"codename":1359,"name":1360},{"items":1634,"totalCount":1578},[1635,1642,1649,1656,1663,1670,1677],{"__typename":1360,"_system_":1636,"header":1639,"content":1640},{"codename":1637,"id":1638},"untitled_content_item_1716694","17166948-24e4-4011-ab12-750195eb08cb","What is the Navan Railway project? ",{"html":1641},"\u003Cp>Navan Railway is a proposed extension of the Iarnród Éireann rail network between Navan and Dublin City Centre via M3 Parkway. &nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1643,"header":1646,"content":1647},{"codename":1644,"id":1645},"why_is_the_project_being_developed__9be49a9","9be49a94-fca3-4cc8-a91f-beb8675fe01f","Why is the project being developed? ",{"html":1648},"\u003Cp>The project is being developed to improve public transport connectivity, support future population and economic growth, and reduce dependency on private cars. It also supports wider national, regional and local policy goals including decarbonisation, regional connectivity and compact growth. \u003Cbr>\n\u003Cbr>\nThe overarching objective of the Navan Railway project is to provide a public transport option that is frequent, reliable, integrated, sustainable and attractive. The project also aims to deliver a public transport option that offers safe, high-capacity connectivity between Navan, the Greater Dublin Metropolitan Area and intermediate urban areas. &nbsp;\u003Cbr>\n\u003Cbr>\nThe project’s sub-objectives include:&nbsp;\u003C\u002Fp>\n\u003Cul>\n  \u003Cli>Supporting compact growth&nbsp;\u003C\u002Fli>\n  \u003Cli>Reducing car dependency and congestion&nbsp;\u003C\u002Fli>\n  \u003Cli>Improving access to employment, education and services&nbsp;\u003C\u002Fli>\n  \u003Cli>Contributing to decarbonisation targets&nbsp;\u003C\u002Fli>\n  \u003Cli>Minimising environmental impacts\u003C\u002Fli>\n  \u003Cli>Improving overall transport safety\t\u003C\u002Fli>\n\u003C\u002Ful>",{"__typename":1360,"_system_":1650,"header":1653,"content":1654},{"codename":1651,"id":1652},"who_is_delivering_the_project__028a95b","028a95bd-1282-4f4f-8b26-2dfe75c41f8d","Who is delivering the project? ",{"html":1655},"\u003Cp>The project is being developed and delivered by Iarnród Éireann with the National Transport Authority as the approving authority for the project. &nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1657,"header":1660,"content":1661},{"codename":1658,"id":1659},"what_is_the_preferred_route_and_how_was_it_identif","d3118a29-9a9e-49d8-b62c-1fc7556f3e4d","What is the Preferred Route and how was it identified? ",{"html":1662},"\u003Cp>The Preferred Route is the corridor within which the railway, stations, parking and associated infrastructure are proposed to be located. &nbsp;\u003Cbr>\n\u003Cbr>\nThe Preferred Route was identified following a robust, step-by-step option selection process. Feedback received as part of the first consultation helped inform a programme of further studies and assessments which resulted in targeted adjustments to the corridor that was presented at the Emerging Preferred Route stage. &nbsp;\u003Cbr>\n\u003Cbr>\nThe Preferred Route corridor extends from Navan to M3 Parkway, where it will connect with the existing rail network towards Dublin City Centre. &nbsp;\u003Cbr>\n\u003Cbr>\nthe Preferred route will be refined further during the next stage of the project, considering feedback received as part of this second consultation, as well as through the preliminary design and environmental assessment processes.&nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1664,"header":1667,"content":1668},{"codename":1665,"id":1666},"what_are_the_main_benefits_of_the_project__d5a7164","d5a7164c-6802-4ad6-83f0-bc31ec00e8e4","What are the main benefits of the project? ",{"html":1669},"\u003Cp>The Navan Railway project will bring many benefits, including:&nbsp;&nbsp;\u003C\u002Fp>\n\u003Cul>\n  \u003Cli>Extension of DART+ to Navan, with frequent and high-capacity train services&nbsp;\u003C\u002Fli>\n  \u003Cli>Connecting communities along the route to Ireland’s expanding and integrated public transport network. Navan is the largest town in Ireland not currently on the rail network&nbsp;\u003C\u002Fli>\n  \u003Cli>Facilitating future social and economic growth in the project area&nbsp;&nbsp;\u003C\u002Fli>\n  \u003Cli>Encouraging sustainable transport choices and reduced dependency on private cars&nbsp;&nbsp;\u003C\u002Fli>\n  \u003Cli>Enhancing access to services for communities along the route and encouraging travel to County Meath by train&nbsp;&nbsp;\u003C\u002Fli>\n\u003C\u002Ful>",{"__typename":1360,"_system_":1671,"header":1674,"content":1675},{"codename":1672,"id":1673},"why_was_the_previous_navan_railway_project_put_on__93e9ddd","93e9ddd2-4190-4bdf-8bb5-bf587cc9903b","Why was the previous Navan Railway project put on hold? Is this the same project? ",{"html":1676},"\u003Cp>The original Navan to Clonsilla railway closed in the 1960s. The section of the original railway from Clonsilla to M3 Parkway was reopened in 2010. Works began to reopen the Navan to M3 Parkway section, but they were put on hold in 2011. \u003Cbr>\n\u003Cbr>\nThe current Navan Railway project has started from the beginning to comply with current Irish and EU legislation, policy requirements and updated planning assumptions.&nbsp;\u003C\u002Fp>",{"__typename":1360,"_system_":1678,"header":1681,"content":1682},{"codename":1679,"id":1680},"when_will_construction_begin__0306815","03068154-25e8-40a3-bad3-28207681232b","When will construction begin? ",{"html":1683},"\u003Cp>Navan Railway is at an early stage of development. Further design work and environmental assessments are required before a Railway Order application is prepared and lodged with An Coimisiún Pleanála. Before construction can commence, planning approval and funding must be secured as the project undergo necessary design, environmental and procurement processes.&nbsp;\u003C\u002Fp>",{"metaTitle":14,"metaDescription":14,"searchIndexPriority":1685,"urlAlias":1686},0,"en-ie\u002Fnspc",{"items":1688},[],1794528235015]