How can we help?

Will my house/wall be damaged?


The works will be undertaken in a manner so as to avoid or minimise impacts on adjoining properties, and it is not anticipated that damage will occur. However, any houses or walls required to facilitate the development will be acquired as part of the Railway Order application process. A condition survey may be required of existing structures and buildings adjacent to the works at certain locations. These will be determined on a case by case basis depending on the works required at that location (e.g. piling, tunnelling). Should your property be deemed to require a condition survey you will be notified and your permission sought to conduct the survey. The condition survey would take place at the preconstruction stage to provide assurance to property owners.
Print
Top