Iarnród Éireann Night-time Track Works
10 December 2025
Here you will find a complete list of planned night-time track works to Iarnród Éireann rail services.
Iarnród Éireann is committed to providing a quality train service to the large number of DART, Commuter and Intercity passengers using the railway on a daily basis. In order to ensure safe delivery of these public services we have to constantly maintain and improve the track infrastructure. Most of this work is safety critical maintenance work which has to take place at night when passenger trains are not running. This work can be noisy and affect people whose homes are near the operating railway as it involves the use of on-track machines and power tools.
We endeavour to notify house owners adjacent to the railway of any planned night-time works near their homes. In the case of apartment blocks and multiple units, communication is primarily through the relevant management companies or multiple unit owners.
Night-time track works can involve:
- Points and Crossing maintenance
- Plain Line Track maintenance
- Vegetation Control
- Bridge maintenance and Renewals
- Ballasting Works
Night-time track works generally take place between midnight and 6am, except on Sundays when work can continue until 8am.
On some occasions, emergency works have to be carried out at short notice and it is not possible to advise home owners in advance. Also, some maintenance work is linear in nature and can be spread over approximately 2km on any one night alone, making it impractical to notify all of the homes that may be affected.
For alterations and amendments to the scheduled timetable due to line improvement works please see our Upcoming Line Improvement Works page.
The following currently scheduled night-time works are in close proximity to residential areas:
| Station / Area | Date | Location |
|---|---|---|
| Broombridge | 15th Dec – 18th Dec | Essential bridge maintenance. Use of heavy on track machinery needed |
| Broombridge | 8th – 13th Dec | Essential bridge maintenance. Use of heavy on track machinery needed |
| Castleknock – Coolmine | 15th Dec – 18th Dec | Essential linear track maintenance. Use of heavy on track machinery needed |
| Clongriffin | 15th Dec – 20th Dec | Access/Egress. Loading on/off machine. Use of heavy on track machines needed |
| Clongriffin – Malahide | 15th Dec – 20th Dec | Essential linear track maintenance. Use of heavy on track machinery needed |
| Co.Wexford | 11th – 14th Dec | Rosslare Strand to Kilrane. Essential linear track maintenance. Use of heavy on track machinery needed |
| Connolly Station | 13th – 15th Dec | Essential track maintenance (re-railing). Use of heavy on track machinery needed |
| Connolly Station | 15th Dec – 18th Dec/20th Dec – 22nd Dec | Essential track maintenance (re-railing). Use of heavy on track machinery needed |
| Corbally, Limerick | 9th - 13th Dec |
Tree felling works planned in the Corbally area, Limerick with expected noise levels during night time hours. The locations affected include Old Park Road, Curramoma Grove, Carriglea, Park Garden and Rosendale Gardens |
| Cork area (Mallow to Kent, Glounthaune to Midleton) | 15th – 19th Dec |
Essential railway intermittent signalling, track delivery and twin-track programme works incl ground investigation surveys incorporating areas along Cork Area Commuter Rail (CACR) corridor. This includes working during night-time hours when commuter trains are non-operational. Signalling and Communications, including piling and drilling works for signal bases. (Lissard, Lissavoura, Lyradane, Rathduff, Monard, Rathpeacon, Old Mallow Road) Killahora – Carrigtwohill (new track area preparation works) |
| Cork area (Mallow to Kent, Glounthaune to Midleton) | 5th-11th Jan |
Essential railway intermittent signalling, track delivery and twin-track programme works incl ground investigation surveys incorporating areas along Cork Area Commuter Rail (CACR) corridor. This includes working during night-time hours when commuter trains are non-operational. Signalling and Communications, including piling and drilling works for signal bases. (Lissard, Lissavoura, Lyradane, Rathduff) Killahora – Carrigtwohill (new track area preparation works) |
| Dalkey | 11th – 13th Dec | Essential track maintenance (points repair). Use of heavy on track machinery needed |
| Dalkey Station | 8th – 13th Dec | Essential bridge maintenance (OBR111). Use of heavy on track machinery needed |
| Dalkey Station | 15th Dec – 20th Dec | Essential bridge maintenance (OBR111). Use of heavy on track machinery needed |
| Drogheda | 8th Dec – 13th Dec | Essential track maintenance. Use of heavy on track machinery needed |
| Drogheda | 15th Dec – 18th Dec | Kearney’s Yard. Access/Egress. Loading on/off machine. Use of heavy on track machines needed |
| Drumcondra | 15th Dec - 18th Dec | Essential track maintenance. Use of heavy on track machinery needed |
| Dun Laoghaire - Sandycove |
11th – 13th Dec |
Essential linear track maintenance (re-railing – tidy up works). Use of heavy on track machinery needed |
| Dun Laoghaire - Sandycove |
18th Dec – 20th Dec |
Essential track maintenance. Use of heavy on track machinery needed |
| Dundalk |
18th Dec – 20th Dec |
Ballyhattin. Access/Egress. Loading on/off machine. Use of heavy on track machines needed |
| Dundalk |
17th Dec – 18th Dec |
Dunleer. Access/Egress. Loading on/off machine. Use of heavy on track machines needed |
| Hazelhatch | 8th - 11th Dec | Essential track maintenance. Use of heavy on track machinery needed |
| Hill of Down |
11th -13th Dec |
Access/Egress. Loading on/off machine. Use of heavy on track machines needed |
| Enfield |
18th Dec – 20th Dec |
Essential track maintenance. Use of heavy on track machinery needed |
| Hill of Down |
18th Dec – 21st Dec |
Access/Egress. Loading on/off machine. Use of heavy on track machines needed |
| Howth |
15th Dec – 20th Dec |
Essential track maintenance (points repair). Use of heavy on track machinery needed |
| Killucan | 11th - 13th Dec | Essential track maintenance. Use of heavy on track machinery needed |
| Killester | 15th Dec – 20th Dec | Essential track maintenance (points repair). Use of heavy on track machinery needed |
| Lucan North | 15th Dec – 18th Dec | Foley’s Yard. Access/Egress. Loading on/off machine. Use of heavy on track machines needed |
| M3 Parkway – Glasnevin - Killucan | 8th – 13th Dec | Essential linear track maintenance. Use of heavy on track machinery needed |
| M3 Parkway – Glasnevin – Killucan | 15th Dec – 20th Dec | Essential linear track maintenance. Use of heavy on track machinery needed |
| Newbridge | 15th Dec – 18th Dec | Essential linear track maintenance. Use of heavy on track machinery needed |
| North Wall | 11th – 13th Dec | Essential track maintenance (re-railing). Use of heavy on track machinery needed |
| Pearse – Tara Street | 15th Dec – 20th Dec | Essential track maintenance (points repair). Use of heavy on track machinery needed |
| Portarlington | 8th – 21st Dec | Essential track maintenance. (panel re-railing) Use of heavy on track machinery needed |
| Portmarnock | 15th Dec – 20th Dec | Access/Egress. Loading on/off machine. Use of heavy on track machines needed |
| Reillys Yard | 15th Dec – 18th Dec | Access/Egress. Loading on/off machine. Use of heavy on track machines needed |