Rosslare ORE Hub Planning Submission
Application Documents
-
Application cover letter
Completed Maritime Area Planning Application form
Copy of Maritime Area Consent
Application payment receipt
Copies of the published newspaper notices
Copy of the Site Notice as erected
EIA Portal acknowledgement
Schedule of prescribed bodies and the notice informing them of the making of the application
Notification to the Coastal Planning Authority Wexford County Council of the making of the application
Record of consultations conducted in respect of the application
Drawing Schedule
Copy of letter received from An Bord Pleanála dated 28/11/2024 to formally close the pre-application procedure
Rehabilitation Schedule
Uisce Éireann Confirmation of Feasibility of water and wastewater connection
Planning Report
Planning Report Appendices 1 - 3
Supporting Documents
Appropriate Assessment Reporting
Water Framework Directive Report
Environmental Impact Assessment Report
-
-
EIAR Table of Contents
EIAR List of Abbreviations
Chapter 1 - Introduction and Methodology
Chapter 2 - Legislation and Policy Context
Chapter 3 - Need for the Project
Chapter 4 - Scoping and Consultation
Chapter 5 - Assessment of Alternatives and Project Design
Chapter 6 - Project Description
Chapter 7 - Soils, Geology, Hydrogeology and Contamination
Chapter 8 - Coastal Processes
Chapter 9 - Water Quality and Flood Risk
Chapter 10 - Terrestrial Ecology
Chapter 11 - Benthic Ecology
Chapter 12 - Fish, Shellfish and Turtle Ecology
Chapter 13 - Marine Mammals
Chapter 14 - Ornithology
Chapter 15 - Commerical Fisheries and Aquaculture
Chapter 16 - Cultural Heritage
Chapter 17 - Traffic and Road Transport
Chapter 18 - Air Quality
Chapter 19 - Noise and Vibration
Chapter 20 - Shipping and Navigation
Chapter 21 - Population and Human Health
Chapter 22 - Material Assets
Chapter 23 - Seascape, Landscape and Visual Impact Assessment
Chapter 24 - Climate
Chapter 25 - Interactions
Chapter 26 - Summary of Mitigation Measures and Monitoring -
Technical Appendix 7 - Soils, Geology, Hydrogeology and Contamination
Technical Appendix 7 - Geotechnical Interpretive Report
Technical Appendix 7 - Soils, Geology, Hydrogeology and Contamination - A
Technical Appendix 7 - Soils, Geology, Hydrogeology and Contamination - B
Technical Appendix 7 - Soils, Geology, Hydrogeology and Contamination - C - P1
Technical Appendix 7 - Soils, Geology, Hydrogeology and Contamination - C - P2
Technical Appendix 7 - Soils, Geology, Hydrogeology and Contamination - C - P3
Technical Appendix 7 - Soils, Geology, Hydrogeology and Contamination - D
Technical Appendix 7 - Soils, Geology, Hydrogeology and Contamination - E
Technical Appendix 7 - Soils, Geology, Hydrogeology and Contamination - F
Technical Appendix 8 - Coastal Processes
Technical Appendix 10 - Terrestrial Ecology
Technical Appendix 11 - Benthic Ecology
Technical Appendix 12 - Fish, Shellfish and Turtle Ecology
Technical Appendix 13 - Marine Mammals
Technical Appendix 14 - Ornithology
Technical Appendix 15 - Commercial Fisheries
Technical Appendix 16 - Cultural Heritage
Technical Appendix 17 - Traffic and Road Transport
Technical Appendix 18 - Air Quality
Technical Appendix 19 - Noise and Vibration
Technical Appendix 20 - Shipping and Navigation
Technical Appendix 23 - Seascape / Landscape Photomontages
LVIA Photomontages Cover Page with Index / Viewpoint Locations / Photography technical details
LVIA Photomontage VP1 Rosslare Strand
LVIA Photomontage VP2 Local road at Rosehill Bay Beach (a + b)
LVIA Photomontage VP3 Local Picnic Area at Rosslare Harbour
LVIA Photomontage VP4 Rosslare Harbour Beach
LVIA Photomontage VP5 Cliff Road west of the N25 (a)
LVIA Photomontage VP5 Cliff Road west of the N25 (b)
LVIA Photomontage VP6 Local road overbridge of the National Railway Line at Ballygerry
LVIA Photomontage VP7 St. Patrick's Church Rosslare
LVIA Photomontage VP8 Station Road at Ballygerry
LVIA Photomontage VP9 Waddingsland Bay Cliff Trail
LVIA Photomontage VP10 R738 regional road at St. Mary's Cemetery north of Tagoat
LVIA Photomontage VP11 N25 (Picnic Area) at Hayesland
LVIA Photomontage VP12 St. Helen's Bay Golf Club & Resort
Aerial Photomontage viewpoints to represent receptors at sea
Application Drawings
-
-
-
0100 Proposed Site Layout Key Plan
0101 Sheet 1 New Small Boat Harbour
0102 Sheet 2 New Small Boat Harbour and ORE Hub
0103 Sheet 3 Sea Scouts Facility and ORE Hub
0104 Sheet 4 ORE Hub Berth 1
0105 Sheet 5 ORE Hub Berth 1 and Berth 2 Platform
0106 Sheet 6 ORE Berth 2 Platform and Trailer Yard
0107 Sheet 7 ORE Hub Berth 2
0108 Sheet 8 Dredge Area
0109 Sheet 9 Dredge Area
0110 Sheet 10 Dredge Area
0111 Site Plan of Future Dev Area in New Small Boat Harbour
0112 Site Plan of New Small Boat Harbour Fishing Quay
0113 Site Plan of New Small Boat Harbour for Local Boat Users
0114 Site Plan of Sea Scouts Compound and Fire Water Tank
0115 Site Plan of ORE Operations Compound -
0200 Overall Plan of Proposed Drainage and Hydraulic Services
0201 Proposed Drainage and Water Sheet 1 New Small Boat Harbour
0202 Proposed Drainage and Water Sheet 2 New Small Boat Harbour and ORE Hub
0203 Proposed Drainage and Water Sheet 3 Sea Scouts Facility and ORE Hub
0204 Proposed Drainage and Water Sheet 4 ORE Hub Berth 1
0205 Proposed Drainage and Water Sheet 5 ORE Hub Berth 1 and Berth 2 Platform
0206 Proposed Drainage and Water Sheet 6 ORE Hub Berth 2 Platform Trailer Yard
0207 Proposed Drainage and Water Sheet 7 ORE Hub Berth 2 -
0300 Overall Plan of Proposed Ducted Services
0301 Proposed Ducted Services Sheet 1 New Small Boat Harbour
0302 Proposed Ducted Services Sheet 2 New Small Boat Harbour and ORE Hub
0303 Proposed Ducted Services Sheet 3 Sea Scouts Facility and ORE Hub
0304 Proposed Ducted Services Sheet 4 ORE Hub Berth1
0305 Proposed Ducted Services Sheet 5 ORE Hub Berth 1 and Berth 2 Platform
0306 Proposed Ducted Services Sheet 6 Berth 2 Platform and Trailer Yard
0307 Proposed Ducted Services Sheet 7 ORE Hub Berth 2
0308 Proposed Site Lighting Lux Levels -
0400 ORE Berth 1 Typical Section
0401 Embankment Typical Section
0402 ORE Berth 2 Typical Section
0403 ORE Berth 2 Platform Combi Wall Typical Section
0404 Fishing Quay Typical Section
0405 New Small Boat Harbour Slipway Typical Section
0406 Sea Scouts Area Slipway Typical Section
0407 CTV Quay Typical Section -
0410 Rosslare ORE Hub Sections Layout Key Plan
0411 ORE Hub Section a-a
0412 ORE Hub Section b-b
0413 ORE Hub Section c-c
0414 ORE Hub Section d-d
0415 ORE Hub Section e-e
0416 ORE Hub Section f-f
0417_Rosslare ORE Hub Navigation Channel Section g-g
0418 Rosslare ORE Hub Navigation Channel Section h-h -
-
-
0500 Quay Furniture Details Typical Cone Fender Details Plan and Section a-a
0501 Quay Furniture Details Life Buoy Safety Chains and Quadrant
0502 Quay Furniture Details 100t Mooring Bollards
0503 Lghting Details Light Mast 30 Meters Details
0504 Quay Furniture Details Ladder and Handrail
0505 Retention Separator Plan Section and Details
0506 Fencing Elevation and Section
0507 ORE Hub Steel Gate Elevation and Section -
0600 Substation Building General Arrangment Plan Elevation and Section
0601 Fire Water Storage General Arrangment Plan Elevation and Section
0602 Sea Scouts Storage General Arrangment Plan Elevation and Section
0603 Fishermens Storage General Arrangement Plan and Sections 1 of 2
0604 Fishermens Storage General Arrangement Elevations 2 of 2
0605 ORE Operations Compound Mobile Buildings General Arrangement
0606 Autotracked Junctions