ECRIPP Public Consultation
- Public Consultation Process
- Current Design Status
- Public Consultation 1
- How to Engage
- Next Steps
- Emerging Preferred Scheme
Public Consultation Process
Public Consultation 1 took place in November 2024 on the Emerging Preferred Scheme. This consultation is now closed. Public Consultation 1 will consider all feedback received, to advance the design through to Public Consultation 2 in 2025, where we will present the Preferred Scheme.
Current Design Status
We are currently in Phase 3 Preliminary Design. Following further studies, assessments, design development, consultation and our review of your feedback, the Preferred Scheme for each Coastal Cell Area will be defined. The Preferred Scheme will provide further detail on how we have used your feedback to refine specific design elements at each Coastal Cell Area.
Public Consultation 1
For Public Consultation 1 stakeholders were invited to make observations and submissions on the Emerging Preferred Scheme.
Full details of each Emerging Preferred Scheme, including maps, drawings and the Preliminary Options Selection Reports are available to view and download on this project website. Full details of the optioneering process is documented in the Preliminary Options Selection Reports.
Emerging Preferred Scheme
How to Engage
Your participation and feedback are an essential part of the design and assessment process. Your local knowledge will inform the emerging design, ensuring it will be a beneficial for you and the local communities as well as delivering the necessary enhanced coastal protection to the existing railway infrastructure.
Please contact us via the following means:
Email: ecrippenquiries@irishrail.ie
Phone line: 01 202 7900
If you would prefer to write to us, please send it or any correspondence to:
ECRIPP
Engineering & New Works Building,
Iarnród Éireann,
Inchicore Works,
Dublin 8 D08 K6Y3
In-person Events
As part of Public Consultation 1; in person events were held in Dun Laoghaire, Bray, Greystones and Wicklow in November 2024 to present the Emerging Preferred Scheme for each CCA.
Further in person events will be held as part of PC2 later this year.
Next Steps
The option selection process and design development that has been undertaken to date has led to the development of the Emerging Preferred Scheme for each coastal cell area, which was the focus of public consultation 1.
All feedback and submissions received from Public Consultation 1 will be reviewed and assessed as part of the design development of the of the Preferred Scheme for Public Consultation 2.