Iarnród Éireann Night-time Track Works
Here you will find a complete list of planned night-time track works to Iarnród Éireann rail services.
Iarnród Éireann is committed to providing a quality train service to the large number of DART, Commuter and Intercity passengers using the railway on a daily basis. In order to ensure safe delivery of these public services we have to constantly maintain and improve the track infrastructure. Most of this work is safety critical maintenance work which has to take place at night when passenger trains are not running. This work can be noisy and affect people whose homes are near the operating railway as it involves the use of on-track machines and power tools.
We endeavour to notify house owners adjacent to the railway of any planned night-time works near their homes. In the case of apartment blocks and multiple units, communication is primarily through the relevant management companies or multiple unit owners.
Night-time track works can involve:
- Points and Crossing maintenance
- Plain Line Track maintenance
- Vegetation Control
- Bridge maintenance and Renewals
- Ballasting Works

Night-time track works generally take place between midnight and 6am, except on Sundays when work can continue until 8am.
On some occasions, emergency works have to be carried out at short notice and it is not possible to advise home owners in advance. Also, some maintenance work is linear in nature and can be spread over approximately 2km on any one night alone, making it impractical to notify all of the homes that may be affected.
For alterations and amendments to the scheduled timetable due to line improvement works please see our Upcoming Line Improvement Works page.
The following currently scheduled night-time works are in close proximity to residential areas:
Night-time Track Works Across Iarnród Éireann Network
| Area | Date | Location |
| Ballyfermot | 20th – 25th April | Essential track maintenance (rail repair). Use of heavy on track machinery needed |
| Blackrock – Dun Laoghaire | 20th – 25th April | Essential linear track maintenance. Use of heavy on track machinery needed |
| Bray | 20th – 25th April | Essential track maintenance (points maintenance). Use of heavy on track machinery needed |
| Castleknock | 13th – 18th April | Essential track maintenance (points repair). Use of heavy on track machinery needed |
| Castleknock | 20th – 25th April | Essential track maintenance (ballast maintenance). Use of heavy on track machinery needed |
| Castlerea Station, Co. Roscommon | 13th - 17th April 18th - 19th April 20th - 26th April | Contractors and staff are engaged to carry out safety critical track maintenance works near Castlerea Station, Co. Roscommon. All the works will take place nightly between 10pm and 6am respectively |
| Clontarf – Harmonstown | 14th – 17th April | Essential linear track maintenance (ballast maintenance). Use of heavy on track machinery needed |
| Co. Kilkenny | 14th – 19th April | Thomastown to Lavistown. Essential linear track maintenance. Use of heavy on track machinery needed |
| Co. Kilkenny | 16th – 17th April | Ballyhale to Jerpoint. Essential linear track maintenance. Use of heavy on track machinery needed |
| Co. Kilkenny | 21st – 25th April | Ballyhale to Jerpoint. Essential linear track maintenance. Use of heavy on track machinery needed |
| Connolly – Clontarf | 20th – 25th April | Essential linear track maintenance (points maintenance). Use of heavy on track machinery needed |
| Connolly – Clontarf | 13th – 18th April | Essential linear track maintenance (IBJ/points maintenance). Use of heavy on track machinery needed |
Cork Area
Upgrades to the Cork Area Commuter Rail (CACR) network include enhancements to the existing signalling system to support future capacity increases. These works require night-time activity when commuter services are not operating. | Week 16 - 13th to 19th April Week 17 - 20th to 26th April Week 18 - 27th April to 3rd May | Delivery and installation of cable troughing and signal bases between Mallow and Kent Station. Signalling and communications installations between Cork and Cobh. Track slewing and relaying of rails between Carrigtwohill and Midleton. |
| Curragh | 13th – 18th April | Essential linear track maintenance (re-railing). Use of heavy on track machinery needed |
| Dalkey – Killiney | 20th – 25th April | Essential linear track maintenance (bridge maintenance). Use of heavy on track machinery needed |
| Dalkey – Killiney | 15th – 18th April | Essential linear track maintenance. Use of heavy on track machinery needed |
| Dalkey Station | 22nd – 25th April | Essential bridge maintenance (OBR109-OBR111). Use of heavy on track machinery needed |
| Donabate | 13th – 17th April | Access/Egress. Loading on/off machine. Use of heavy on track machines needed |
| Drogheda | 13th – 18th April | Kearney’s Yard & Railway Terrace. Essential linear track maintenance. Use of heavy on track machinery needed |
| Dun Laoghaire | 20th – 25th April | West Pier. Access/Egress. Loading on/off machine. Use of heavy on track machines needed |
| Dundalk | 13th – 17th April | Dunleer. Access/Egress. Loading on/off machine. Use of heavy on track machines needed |
| Glasnevin | 13th – 18th April | Essential track maintenance (points repair). Use of heavy on track machinery needed |
| Glasnevin – North Wall | 20th – 25th April | Essential linear track maintenance (ballast/points maintenance). Use of heavy on track machinery needed |
| Glenageary – Dalkey | 20th – 19th June | Essential linear track maintenance (track renewal). Use of heavy on track machinery needed |
| Greystones | 20th – 25th April | Essential track maintenance (track survey). Use of heavy on track machinery needed |
| Greystones | 20th – 25th April | Ennis Lane. Access/Egress. Loading on/off machine. Use of heavy on track machines needed |
| Hazelhatch | 20th – 25th April | Essential track maintenance (ballast maintenance). Use of heavy on track machinery needed |
| Hazelhatch | 13th – 18th April | Essential linear track maintenance (re-railing – tidy up works). Use of heavy on track machinery needed |
| Heuston Station | 20th – 25th April | Essential track maintenance (switch panel renewal). Use of heavy on track machinery needed |
| Heuston Station | 13th – 19th April | Essential track maintenance (switch panel renewal). Use of heavy on track machinery needed |
| Howth Junction – Howth | 20th – 25th April | Essential linear track maintenance (overhead cable inspections & maintenance packing). Use of heavy on track machinery needed |
| Howth Junction – Howth | 13th – 14th April / 17th – 19th April | Essential linear track maintenance (rail sweeping & rail repair). Use of heavy on track machinery needed |
| Kildare | 20th – 25th April | Essential track maintenance (muck digging). Use of heavy on track machinery needed |
| Kildare – Cherryville | 13th – 18th April | Essential linear track maintenance (ballast maintenance). Use of heavy on track machinery needed |
| Killucan – Ashtown | 20th – 25th April | Essential linear track maintenance. Use of heavy on track machinery needed |
| Laytown | 13th – 16th May | Essential track maintenance (re-railing). Use of heavy on track machinery needed |
| Lucan North | 20th – 25th April | Foley’s Yard. Access/Egress. Loading on/off machine. Use of heavy on track machines needed |
| Lucan North | 13th – 18th April | Foley’s Yard. Access/Egress. Loading on/off machine. Use of heavy on track machines needed |
| Newbridge | 20th – 25th April | Essential track maintenance (muck digging). Use of heavy on track machinery needed |
| Pearse – Lansdowne Road | 13th – 18th April | Essential linear track maintenance (packing/IBJ maintenance). Use of heavy on track machinery needed |
| Portarlington | 20th -25th April | Essential track maintenance (points maintenance). Use of heavy on track machinery needed |
| Reilly’s Crossing | 13th – 18th April | Access/Egress. Loading on/off machine. Use of heavy on track machines needed |
| Sallins | 20th – 25th April | Essential track maintenance (ballast maintenance). Use of heavy on track machinery needed |
| Sallins | 13th – 18th April | Essential linear track maintenance (re-railing – tidy up works). Use of heavy on track machinery needed |
| Seapoint | 13th – 18th April | Essential track maintenance (retaining wall maintenance). Use of heavy on track machinery needed |
| Sydney Parade – Blackrock | 13th – 18th April | Essential linear track maintenance (re-railing – tidy up works). Use of heavy on track machinery needed |
| Westland Row | 20th – 25th April | Essential bridge maintenance (UBLL51). Use of heavy on track machinery needed |
| Westland Row | 13th – 18th April | Essential bridge maintenance (UBLL51). Use of heavy on track machinery needed |